Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-06-05 Special Meeting Minutes

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING MINUTES                                                               5 JUNE 2019


          c.     the curtilage of each of the particular dwelling units being allocated to that
                 dwelling unit as exclusive use area.
          Easements
    66.   Easement for the purposes of:
          i.     All stormwater quality treatment devices;
          ii.    Bushfire access;
          iii.   Pedestrian access from the motel (lot 2) to connect to the IGA Shopping Centre
                 through lot 3; and
          iv.    Driveway vehicle access to each lot,
          must be registered against the titles of the properties in favour of the relevant authority
          and/or property over the land area on the subject site .
    67.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    68.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
          Electricity and Telecommunication Services
    69.   Reticulated electricity and telecommunication services must be provided to each lot in
          accordance with the standards and requirements of the relevant service provider.
    70.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    71.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and all
          applicable legislation at the time of construction.




3   MEETING CLOSURE
    The meeting closed at 11.21am.




                                                                                     Page 16 of 16
Log in to download the original file

2019-06-05 Special Meeting Minutes(PDF, 431KB).pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.