SPECIAL MEETING MINUTES 5 JUNE 2019
a. Air-conditioning and Refrigeration
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. 10pm to 7am: No audible noise.
The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice. The certification must be provided prior to sealing of the plan of survey or
commencement of use of the Visitor accommodation Type 4 motel building, whichever
occurs first.
59. When requested by Noosa Council, a Noise Impact Assessment Report (NIAR)
showing monitoring and recording of noise levels must be undertaken to investigate
any non-vexatious complaint caused by noise emissions from operations at the
premises. Such monitoring must be undertaken and completed within a reasonable
and practicable timeframe as nominated by council and be performed by a suitably
qualified and experienced person.
60. The NIAR is to be submitted to Council detailing the results of such monitoring and
recommendations for any measures to achieve compliance with noise emission limits
set out in Conditions 57 and 58
RECONFIGURATION OF A LOT
Approved Plans
61. Development undertaken in accordance with this approval must generally comply with
the approved plan listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
7254 prop sub C Proposed Subdivision Plan 28 February 2019
62. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
63. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
64. Prior to sealing of the plan of survey the following works must be completed to the
reasonable satisfaction of Council:
a. The required noise attenuation works to the existing IGA building.
b. All driveway accesses to each lot.
c. All pedestrian pathways.
65. Any future subdivision of the Visitor accommodation – Type 4 development within
Stage 2 on the approved plans must be a community title scheme building format plan
with:
a. the twenty (20) separate lots in the format plan being defined by the footprint of
each dwelling unit building;
b. the balance area of that part of the subject land being included in relevant
common property; and
Page 15 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.