SPECIAL MEETING MINUTES 5 JUNE 2019
c. driveways to each residence that are in accordance with Council’s Standard
Drawings RS-049, RS-050 and any associated addendums
d. a driveway to the multi-unit building that is in accordance with Council’s Standard
Drawing RS-051 and any associated addendums
e. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance safety. Warning signage must be
provided near the exit from the development site to warn motorists of pedestrian
movements and other vehicles at the Sandpiper Court entrance
f. clearly visible signage must be erected at the threshold of the internal road, which
clearly indicates to motorists and pedestrians that they are entering a private road
system
16. If the development is to be staged a temporary sealed turnaround facility must be
constructed at the end of each road left temporarily incomplete as a result of the
development staging. The temporary turnaround facility must be in accordance with an
Operational Works approval and must be of sufficient size to accommodate the 3-point
turn manoeuvre of a refuse collection vehicle.
Car Parking
17. Car parking spaces must be provided in accordance with the approved plans and
marked on the site and made available and accessible at all times while the use is
operating. The works must be undertaken in accordance with an Operational Works
approval.
Service Vehicles
18. Service vehicle parking, manoeuvring and standing spaces must be provided for the
Visitor accommodation Type 4 motel building on the site in accordance with the
approved plans. The works must be undertaken in accordance with an Operational
Works approval.
Pedestrian Facilities
19. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. the internal pathway network generally in accordance with the approved plans;
b. a 2m wide pathway connection to the existing pathway network located in the
reserve to the north of the site;
c. a 2m wide pathway connection to the existing commercial development in the
southern part of the subject site.
Stormwater Drainage
20. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval.
21. A Stormwater Management Plan must be submitted for approval as part of an
Operational Works application. The plan must address the management of stormwater
quantity and quality and must be generally in accordance with the Stormwater
Management Plan (SLR, 23 March 2018) being exhibit 64 in appeal 4066 of 2017 with
the following specific modifications.
a. The development shall include a 3kL tank to be provided to collect and reuse roof
runoff from each unit, and a 200kL tank must be provided to collect and reuse
runoff from the motel.
Page 6 of 16