Original source · versioned page text
2019-02-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 FEBRUARY 2019
Building Appearance
7. A mix of materials and colours must be incorporated into the external building
finishes reflective of Cooroy’s traditional character and the schedule detailed on
All Design and Drafting plan DA11 and dated 5 February 2019.
8. All air conditioning units or other mechanical equipment must be fully enclosed
or screened such that they are not visible from the street frontages nor adjoining
properties.
Fencing and Walls
9. Fencing must be generally in accordance with the approved plans and setback
an average of 1 metre from the front property boundary and articulated by
stepping the design at maximum 5 metre intervals. Any fencing on the front
boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
10. The area of land between the fence and the front property boundary must be
densely landscaped to screen any fencing from the street.
Clothes Drying Areas
11. Each dwelling unit must be provided with access to an outdoor clothes line which
is screened from public view.
Community Management Statement
12. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the
Building Format Plan (or similar) to Council for compliance assessment.
13. All clauses and by-laws of the proposed Community Management Statement
must accord with the requirements of this Decision Notice.
ENGINEERING
Site Access and Driveway
14. Vehicular access driveways to serve the development shall be constructed from
the Kauri Street and Olivine Street frontages of the site generally in accordance
with the final approved layout plans and as amended by the conditions of this
permit and in compliance with the applicable engineering standards and
drawings.
15. Sealed access driveways must be provided from Kauri Street and Olivine Street
frontages of the site to all parking and manoeuvring areas of the development
generally in accordance with the final approved layout plans as amended by the
conditions of this permit. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
15.1. Driveway crossovers generally in accordance with IPWEAQ standard
drawings R-049 and R-050, and to grades that prevent vehicles from
scraping and/or bottoming whilst also allowing for compliant grades and
levels that match any existing or proposed pathway and grassed verge
without posing trip or safety hazards to the public.
Page 6 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.