Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2107-23530 SRA Amended response - with conditions

Attached to the e-mail MCU21/0110 - SRA application correspondence - Changed referral agency response—with conditions.

of 9

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                             2107-23530 SRA




                          the Disability Standards for Accessible Public Transport
                           2002 - subsection 31(1) of the Disability Discrimination
                           Act 1992;
             (ii)     include lighting in accordance with AS/NZS 1158.3.1 –
                      Lighting for Roads and Public Spaces, Part 3.1: Pedestrian
                      Area (Category P) Lighting – Performance and Design
                      Requirements; and
             (iii)    provide access and hardstand, and shelter with seats, for
                      waiting and boarding/alighting passengers.

        RPEQ certification, with supporting documentation, must be provided to
        the Program Delivery and Operations Unit, North Coast Region
        ([email protected]) within the Department of Transport
        and Main Roads confirming that the development has been designed
        and constructed in accordance with parts (a) and (b) of this condition.
10.     (a) A RPEQ certified Traffic Management Plan must be prepared and             (a) & (b)
7.      given to the Program Delivery and Operations Unit, North Coast Region         Prior to the
        (via [email protected]) within the Department of                commencement of
        Transport and Main Roads.                                                     use, and where on
                                                                                      site, to be
        (b) The Traffic Management Plan must demonstrate how operation of the         maintained at all
        porte cochere will be monitored and managed to ensure safe movement           times
        of vehicle and pedestrians, in particular when a 14.5m coach is
        traversing the porte cochere when other vehicles are utilising the same.      (c) At all times
                                                                                      during operation.
        (c) The operation of the development must be undertaken in accordance
        with the Traffic Management Plan.




State Assessment and Referral Agency                                                            Page 7 of 9
Log in to download the original file

2107-23530 SRA Amended response - with conditions.pdf · 455 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.