                                                                                                    MCU13/0251.01

                      Equitable Access and Facilities
               3.     The plans for the proposed building work have NOT been assessed for compliance with
                      the requirements of the National Construction Code - Building Code of Australia (Volume
                      1) as they relate to people with disabilities. Your attention is also directed to the fact that
                      in addition to the requirements of the National Construction Code as they relate to
                      people with disabilities, one or more of the following may impact on the proposed
                      building work:
                      (a)     the Disability Discrimination Act 1992 (Commonwealth);
                      (b)     the Anti-Discrimination Act 1991 (Queensland); and
                      (c)     the Disability (Access to Premises – Buildings) Standards
                      Aboriginal Cultural Heritage Act 2003
               4.     There may be a requirement to establish a Cultural Heritage Management Plan and/or
                      obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person
                      who carries out an activity must take all reasonable and practicable measures to ensure
                      the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply
                      with the duty of care. Substantial monetary penalties may apply to individuals or
                      corporations breaching this duty of care. Injunctions may also be issued by the Land
                      and Resources Tribunal, and the Minister administering the Act can also issue stop
                      orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
                      the cultural heritage value of Aboriginal cultural heritage.
                       You should contact the Cultural Heritage         Unit on 07 3247 6212 to discuss any
                       obligations under the ACH Act.
                      Co-ordination of Operational Works Assessment
               5.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will
                      result if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               6.     A preliminary Construction Management Plan must be submitted with the Operational
                      Works application and must address the following:
                      (a)     traffic management during all aspects of the construction phase including:
                              (i)    a Traffic Management Control Plan in accordance with the Manual of
                                     Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                     and traffic control measures prior to construction
                              (ii) maintenance of safe pedestrian access for the areas affected by the works
                                     during and after daily construction has ceased
                              (iii) proposed fencing to the site during the construction phase of the
                                     development
                              (iv) provision for worker car parking
                      (b)     maintenance and protection of water quality and existing drainage lines through
                              the construction site, through the implementation of appropriate erosion and
                              sediment control measures
                      (c)     works programme identifying key components of the works and their respective
                              durations
                      (d)     establishment of a communication protocol with the general public, adjoining
                              owners, emergency services and local businesses to advise of agreed
                              construction times, impacts on traffic, services and other relevant issues
                      (e)     identification of complaint management procedures including:
                              (i)    contact details for the on-site manager
                              (ii) dispute resolution procedures


                                                                                                    Page 11 of 16


Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016

Used in these records

About this file

File size
148 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

160105 NSC Change to MCU Approval 111016.pdf · 148 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.