160105 NSC Change to MCU Approval 111016 · MCU13/0251
Attached to the e-mail Request for change to approval MCU13/0251.03.
MCU13/0251.01
Unitywater
22. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
23. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 30 litres per second.
24. A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Additional water meters must be installed for each title of a
community title or sub-lease scheme. Meters must be Unitywater approved, installed in
accordance with Unitywater requirements and remain accessible at all times for reading
and maintenance purposes.
25. Water meters must be located on alternative boundaries to electrical pillars.
26. The existing Unitywater sewer infrastructure must be relocated clear of the proposed
building works prior to commencement of excavation on site.
27. Written approval to enter and construct must be provided from property owners through
which external sewers or relocated sewers traverse. This must be submitted with
lodgment of the associated development application for Operational Works.
28. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards. Easements
shall be centred over the pipe. Easement terms shall be the most current registered
dealing held by the Department of Natural Resources & Mines and shall not be altered
or amended.
29. Buildings, basements and other structures must maintain a minimum clearance of 1.5
metres from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or
sewer inspection opening. Any proposed or existing retaining wall crossing Unitywater
sewer mains must be self supporting for a minimum of 1.0 metre each side of the sewer
pipe and piered below the zone of influence of the sewer.
30. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
31. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature, and suitable approved
varieties.
32. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Landscaping
33. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval, Planning Scheme Policy 3
Landscaping Plants and Guidelines and must include in particular:
(a) The works generally shown on the Approved Plans unless amended by these
conditions
(b) A minimum 3.5m wide landscaped area on the David Low Way frontage within the
site boundary, extending from the bus-stop to the intersection with the unnamed
road, with at least 2.5m of the landscaped area at road level
(c) The transformer is not to be located within the landscape setback areas
(d) A minimum 2m wide landscaped area on the unnamed road frontage within the
site boundary with at least 1.2m of the landscaped area at road level
Page 5 of 16
Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
160105 NSC Change to MCU Approval 111016.pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.