                                                                                                 MCU13/0251.01

                      Unitywater
               22.    Construction activities must not impede the access of Unitywater or Fire Brigade
                      personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
               23.    The fire-fighting demand on Unitywater’s water supply system from the development
                      must not exceed 30 litres per second.
               24.    A single Unitywater installed primary water meter must be provided immediately inside
                      the property boundary. Additional water meters must be installed for each title of a
                      community title or sub-lease scheme. Meters must be Unitywater approved, installed in
                      accordance with Unitywater requirements and remain accessible at all times for reading
                      and maintenance purposes.
               25.    Water meters must be located on alternative boundaries to electrical pillars.
               26.    The existing Unitywater sewer infrastructure must be relocated clear of the proposed
                      building works prior to commencement of excavation on site.
               27.    Written approval to enter and construct must be provided from property owners through
                      which external sewers or relocated sewers traverse. This must be submitted with
                      lodgment of the associated development application for Operational Works.
               28.    Easements of between 3 and 10 metres must be provided over all Unitywater sewers
                      located within property boundaries in accordance with the SEQ standards. Easements
                      shall be centred over the pipe. Easement terms shall be the most current registered
                      dealing held by the Department of Natural Resources & Mines and shall not be altered
                      or amended.
               29.    Buildings, basements and other structures must maintain a minimum clearance of 1.5
                      metres from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or
                      sewer inspection opening. Any proposed or existing retaining wall crossing Unitywater
                      sewer mains must be self supporting for a minimum of 1.0 metre each side of the sewer
                      pipe and piered below the zone of influence of the sewer.
               30.    Storm water retention systems and gross pollutant traps must maintain a minimum
                      clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
               31.    Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
                      Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
                      plants within these clearances must be low growing when mature, and suitable approved
                      varieties.
               32.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
                      infrastructure must not adversely affect the integrity of the infrastructure. All costs
                      associated with repair, replacement or alteration of infrastructure must be met by the
                      applicant.
                      Landscaping
               33.    The development site must be landscaped. The works must be undertaken in
                      accordance with an Operational Works approval, Planning Scheme Policy 3
                      Landscaping Plants and Guidelines and must include in particular:
                      (a)     The works generally shown on the Approved Plans unless amended by these
                              conditions
                      (b)     A minimum 3.5m wide landscaped area on the David Low Way frontage within the
                              site boundary, extending from the bus-stop to the intersection with the unnamed
                              road, with at least 2.5m of the landscaped area at road level
                      (c)     The transformer is not to be located within the landscape setback areas
                      (d)     A minimum 2m wide landscaped area on the unnamed road frontage within the
                              site boundary with at least 1.2m of the landscaped area at road level


                                                                                                 Page 5 of 16


Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016

Used in these records

About this file

File size
148 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

160105 NSC Change to MCU Approval 111016.pdf · 148 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.