Council archive · source document
160105 NSC Change to MCU Approval 111016 · MCU13/0251
Attached to the e-mail Request for change to approval MCU13/0251.03.
MCU13/0251.01
18. Certification must be submitted from a suitably qualified person which certifies that the
recommendations of a Noise Management Plan approved by Council have been
incorporated into the development.
Waste Management Plan
19. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
for the day-to-day operation of the development is to be submitted and approved by
council prior to the issue of a Development Permit for Operational Works. The Plan
should include the following information as a minimum:
• The types of waste that will be generated from the activities approved within the
development.
• Estimated volumes or tonnage of both recyclables and waste generated.
• Methods to be used for dealing with any green waste.
• Initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
• Description of procedures for getting all waste to the bins; the storage of bins and
the collection of bins by the contractor.
• A description of the design details of waste storage and recycling areas including
size, location, elevation, enclosure/s, floor plan and methods of bin washing that
prevent contamination of storm water and an appropriately sized bin wash area
drained to sewer.
• A description of types and volume of waste storage containers to be used.
• The waste and recycling storage area should include the provision of correctly
sized containers for all waste and recycling materials including putrescible matter,
non-recycling waste, paper/ cardboard, glass, aluminium/steel cans, waste oil,
styrofoam boxes, etc., and bin washing facilities connected to sewer.
• A detailed description of the waste vehicle access to collect waste including
vehicle turnarounds consistent with vehicle access requirements that allow
vehicles to enter and leave the site in a forward direction. It should be noted that:
o Waste vehicles are front loading for steel bins 1.5 to 3m3 bins
o Waste vehicles are rear loading for plastic low noise bins 1.1m3 bins
o Waste vehicles are side loading for 240 litre wheelie bins
o The advisory notes contain specifications for Refuse Vehicle Access
Requirements for design purposes
Outdoor Lighting
20. Any outdoor lighting with the potential to affect surrounding residential premises shall be
designed, installed, operated and maintained in accordance with AS4282 "The Control
of the Obtrusive effects of Outdoor Lighting".
21. During operating hours, all parking areas, pedestrian areas and entrances/exits to all
stairwells, lifts and public toilets must be well lit with vandal resistant lighting and with
intensities to satisfy the requirements of Australian Standard AS1158 “Public Lighting
Code”. Lighting must be designed to reduce the contrast between shadows and well lit
areas.
Page 4 of 16
Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
160105 NSC Change to MCU Approval 111016.pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.