                                                                                                     2508-47877 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.    Conditions                                                                       Condition timing
 Material change of use
 10.9.4.2.4.1 — The chief executive administering the Planning Act 2016 nominates the Director-
 General of the Department of Transport and Main Roads (DTMR) to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.     Utilities, infrastructure and services are to be relocated generally in          Prior to
        accordance with Proposed Site Layout sheet C04, prepared by Ingeniir             commencement of use
        Pty Ltd, dated 20/10/2025, with reference 251502, and Issue 3, as                and to be maintained
        amended in red by SARA on 10 November 2025 to show the works.                    at all times.
 2.     (a)    Carry out the stormwater management of the development                    (a) At all times.
               generally in accordance with:
                i.  Stormwater Management Plan, prepared by Ingeniir Pty                 (b) Within 20 business
                    Ltd, dated 24/07/2025, with reference 251502-SMP, and                days of the completion
                    Revision 01, specifically: section 4: Stormwater Strategy            of works.
                    and section 6: Stormwater Quantity; and
               ii.  Proposed Stormwater and Site Level Layout sheet C05,
                    prepared by Ingeniir Pty Ltd, dated 20/10/2025, with
                    reference 251502, and Issue 3.

        (b)    Submit RPEQ certification (with supporting documentation) to
               the North Coast Regional Corridor Management team within the
               DTMR, via [email protected] confirming that
               the development has been constructed in accordance with part
               (a) of this condition.
 3.     (a)    Road access is located generally in accordance with Proposed
                                                                                         (a) At all times.
               Site Layout sheet C04, prepared by Ingeniir Pty Ltd, dated
               20/10/2025, with reference 251502, and Issue 3, as amended in
               red by SARA on 10 November 2025 to show the road access                   (b) and (c):
               location.                                                                 Prior to the
                                                                                         commencement of
        (b)    Provide road access works comprising of a Vehicle Crossing,               use.
               Heavy Duty, General Wide with a W1 value of 6m at the road
               access location referred to in part (a) of this condition.

        (c)    Design and construct the road access works, referred to in part
               (b) of this condition, in accordance with:
                i.    the Institute of Public Works Engineering Australasia
                      (IPWEA) drawing number RSD-102 Revision A;
               ii.    DTMR Road Planning and Design Manual, 2nd Edition;
              iii.    DTMR Policies and Technical Specifications;
              iv.     DTMR Standard Drawings Roads; and
               v.     relevant local government requirements.
 4.     (a)    Close and remove the existing vehicular property access located           (a) and (b):
               between Lots 21 & 22 C5605 and Myall Street.                              Prior to the
                                                                                         commencement of
        (b)    The road works to close and remove access, referred to in part            use.
               (a) of this condition, must be in accordance with DTMR Road
               Planning and Design Manual, 2nd Edition. The road works must:
                i.    remove the driveway crossovers and any drainage
                      structure/s beneath the driveway;


 State Assessment and Referral Agency                                                                    Page 3 of 7
Log in to download the original file

2508-47877 SRA - SARA response with conditions.pdf · 350 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.