66.7 auditing arrangements;
66.8 how the requirements are to be incorporated into construction and works contracts;
66.9 how the Developer’s employees, contractors and the contractor’s employees will be
informed and trained with respect to the environmental protection requirements;
66.10 enforcement; and
66.11 penalties for non-compliance.
67. The EMP shall include a construction management plan for the Development prepared for the
Site by a suitably qualified consultant. This construction management plan shall be specific
for the resort construction and shall address the following issues to the reasonable satisfaction
of the Manager – Land Development:
67.1. construction staging and timing;
67.2. access and construction vehicle parking and traffic management;
67.3. water quality protection;
67.4. vegetation management & protection of vulnerable plant species;
67.5. fauna habitat and fauna corridor management;
67.6. environmental management in accordance with the Conditions and the EMP;
67.7. environmental protection requirements to be specified in all construction, rehabilitation,
landscaping and works contracts;
67.8. environmental safeguards and contingency plans to deal with accidental events and
acts of god (ie floods, landslides etc);
67.9. ensure that disturbed areas are confined to development areas and shall not encroach
into the 10 metre setback to the creek (including stockpiling and temporary works);
67.10.safety;
67.11.responsibilities;
67.12.induction and training, including environmental protection requirements;
67.13.staged sediment and erosion control;
67.14.work hours;
67.15.legislative compliance;
67.16.geotechnical requirements including stability of the Site;
67.17.aquatic ecosystem protection;
67.18.air, noise and vibration management;
67.19.vehicle wash down requirements;
67.20.on-site machinery and vehicle storage;
67.21.vehicle and machinery maintenance;
67.22.on-site storage of excavated materials;
67.23.on-site storage of topsoil, mulch and other landscaping supplies;
67.24.storage and handling of dangerous goods on site;
67.25.on-site storage of construction materials;
67.26.bushfire prevention in accordance with the Fire Management Plan;
Page 18 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.