Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                      2006/823

211. The stormwater management plan shall take into account matters specified in section 19.4 of
     the Environmental Protection (Water) Policy 1997.
212. Key water quality objectives to be reflected in the stormwater management plan are the
     protection of aquatic ecosystems in both the intermittent creek draining the site and within the
     receiving waters and the Noosa River, as well as primary contact recreational standards within
     the receiving waters. This plan shall ensure the following water quality objectives are
     achieved prior to water exiting the stormwater system and entering the 10 metre buffer zone
     during construction and operational phases of the development:
      212.1      Suspended Solids < 50mg/L
      212.2      pH = 6.5 to 8.5
      and during operational phase of the development Total Phosphorous and Total Nitrogen
      reduced as per the requirement of the “Water Sensitive Urban Design – Developing Design
      Objectives for water sensitive urban development in South East Queensland” Version 1 – 12
      October 2006 details in its Table 2.1
213. The stormwater management plan for the entire Site shall address:
      213.1.Construction, establishment and operational phases.
      213.2.For the establishment and operational phases for the Resort, at least two per year event
            and three monthly campaign based water quality monitoring for:
              213.2.1. Total Nitrogen
              213.2.2. Total Phosphorus
              213.2.3. Suspended Solids & Turbidity
              213.2.4. pH
              213.2.5. Salinity
              213.2.6. Temperature
              213.2.7. Dissolved Oxygen
              213.2.8. Trash & gross pollutants
              213.2.9. Algal count and identification (on event basis and following monitoring to
                       ensure remediation is successful)
              213.2.10. Faecal coliforms
      213.3.The monitoring shall continue for a period of 3 years from completion of the final stage
            of construction.
      213.4.For the construction phase for the Resort, at least two per year event and monthly
            campaign based water quality monitoring for:
              213.4.1. Suspended Solids & Turbidity
              213.4.2. Temperature
              213.4.3. Salinity
              213.4.4. Trash & gross pollutants
              213.4.5. Dissolved Oxygen
      213.5.In addition to the above, inspections for erosion and deposition, and build up of trash
            and gross pollutants should be carried out on a weekly basis during the construction
            period and corrective measures implemented.


                                                                                  Page 37 of 59

Used in these records

About this file

File size
329 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published].pdf · 329 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.