Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03
2006/823
211. The stormwater management plan shall take into account matters specified in section 19.4 of
the Environmental Protection (Water) Policy 1997.
212. Key water quality objectives to be reflected in the stormwater management plan are the
protection of aquatic ecosystems in both the intermittent creek draining the site and within the
receiving waters and the Noosa River, as well as primary contact recreational standards within
the receiving waters. This plan shall ensure the following water quality objectives are
achieved prior to water exiting the stormwater system and entering the 10 metre buffer zone
during construction and operational phases of the development:
212.1 Suspended Solids < 50mg/L
212.2 pH = 6.5 to 8.5
and during operational phase of the development Total Phosphorous and Total Nitrogen
reduced as per the requirement of the “Water Sensitive Urban Design – Developing Design
Objectives for water sensitive urban development in South East Queensland” Version 1 – 12
October 2006 details in its Table 2.1
213. The stormwater management plan for the entire Site shall address:
213.1.Construction, establishment and operational phases.
213.2.For the establishment and operational phases for the Resort, at least two per year event
and three monthly campaign based water quality monitoring for:
213.2.1. Total Nitrogen
213.2.2. Total Phosphorus
213.2.3. Suspended Solids & Turbidity
213.2.4. pH
213.2.5. Salinity
213.2.6. Temperature
213.2.7. Dissolved Oxygen
213.2.8. Trash & gross pollutants
213.2.9. Algal count and identification (on event basis and following monitoring to
ensure remediation is successful)
213.2.10. Faecal coliforms
213.3.The monitoring shall continue for a period of 3 years from completion of the final stage
of construction.
213.4.For the construction phase for the Resort, at least two per year event and monthly
campaign based water quality monitoring for:
213.4.1. Suspended Solids & Turbidity
213.4.2. Temperature
213.4.3. Salinity
213.4.4. Trash & gross pollutants
213.4.5. Dissolved Oxygen
213.5.In addition to the above, inspections for erosion and deposition, and build up of trash
and gross pollutants should be carried out on a weekly basis during the construction
period and corrective measures implemented.
Page 37 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.