213.6.An operational phase water quality management plan shall be prepared to address
basin landscape zone and water treatment device water quality maintenance
requirements for stormwater management measures and devices, contingency
measures for aquatic plant growth, loss of vegetation in swales and filter strips, pollution
response and algal blooms and should include a mosquito management strategy.
213.7.Responsibilities are to be clearly delineated.
213.8.Non-compliance with prescribed water quality standards should trigger the
implementation of measures/further testing to rectify.
213.9.Monthly reports on monitoring, incidents, corrective action and plan updates are
required to be submitted to Council. These reports are to be submitted in a form
acceptable to the Manager – Land Development and are to highlight any non-standard
results.
213.10. Any stormwater outlet to the creeks on the Site are to be stabilised with appropriate
energy dissipation and local armouring. Regular monitoring of creek erosion is
required with appropriate corrective action specified to ensure a stable creek system.
All work to be undertaken to minimise impacts on the Environmental Values of the
creek system.
214. The operational stage components of the stormwater management plan shall be included in
the community management statements for all bodies corporate having control of any part of
the Site and assign responsibilities for compliance in terms of the reasonable satisfaction of
the Manager – Land Development.
215. The Developer shall provide details of the size and design of the necessary sediment basins
for the control of sediment on the site within the Erosion and Sediment Control Plan and the
Stormwater Management Plan.
216. Upper track flow diversions are to be designed to divert up to the ARI 10 year event or greater.
Water Quality
217. The Developer is to install water quality control devices generally in accordance with the
Council’s Planning Scheme Policy and to achieve the specified water quality objectives for the
site. Detailed plans and specifications are to be prepared and submitted (after consultation
with officers of the Council) with the relevant applications for either operational works, building
works, plumbing works or drainage works and are to be to the reasonable satisfaction of the
Manager – Land Development.
Drainage
218. The Developer is to complete the drainage works progressively in conjunction with
development of the site. Detailed drainage plans and specifications are to be prepared and
submitted (after consultation with officers of the Council) with the relevant applications for
either operational works, building works, plumbing works or drainage works and are to be to
the reasonable satisfaction of the Manager - Land Development. All drainage works are
required to be provided by the Developer at its own cost.
Boulder Fence
219. Prior to the commencement of building works in the areas to be protected by the boulder
retention fences, the Developer shall construct steel boulder retention fences (being a
Geobrugg rockfall protection system or similar) or other approved rockfall protection devices to
the reasonable satisfaction of a Registered Professional Engineer of Queensland (RPEQ)
specialising in geotechnical engineering. Certification by the RPEQ will be submitted to
Council prior to the use commencing.
Page 38 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.