Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03
2006/823
229. Retention systems for the Resort Central Facilities Building and the Resort Residential
Buildings are to be as per details of geotechnical reports prepared by Golder Associates.
Where required, excavated faces in rock should have appropriate ground support measures to
contain potentially unstable rock wedges. These could include shotcrete, rock bolts, rock
anchors or alternative engineering support systems. Certification shall be submitted to Council
following building works detailing that the engineering support systems are stable and
satisfactory for the life of the project.
230. Detailed plans and specifications detailing earthworks for all roads (and prepared after
consultation with the Manager – Land Development) are to be submitted with the relevant
applications for either plumbing, drainage, building or operational works.
231. Earthworks associated with all roads are to be completed in accordance with any development
permits for plumbing, drainage, operational or building works, and approved management
plans.
232. Retaining walls in the resort area are to make provision for Koala movement through the area,
where applicable.
233. All proposed fill material is to be tested by an approved geotechnical testing authority (NATA
registered) and the results submitted for approval by the Manager - Land Development.
Compaction and fill is to be carried out under Level 1 supervision in accordance with
Australian Standard – AS 3798 – 1996. Following completion of filling, compaction tests are to
be certified by an RPEQ and certification submitted to Council. Development permits for
building works will not be issued for areas of filling unless the fill compaction tests are to the
reasonable satisfaction of the Manager – Building Services.
234. Filling that will result in the pondage of water on or off the Site (other than any works
associated with the approved drainage system) will be prohibited.
235. All disturbed areas are to be revegetated within 10 days following completion of earthworks to
reduce erosion and transport of sediments.
236. All material removed from the Site is to be disposed of in an appropriate manner and only at
locations approved by a Local Government or the Environmental Protection Agency.
237. Contaminated soil currently contained within the containment cell on the site, shall be removed
in accordance with Environmental Protection Agency requirements.
238. All material stockpiles on the Site must be in a location approved in the Environmental
Management Plan or otherwise approved by the Manager – Land Development, which
approval is not to be unreasonably withheld.
Civil Engineering
239. The earthworks and services for the resort must be confined to the perimeters of the
developable area and shall not be located within the 10 metre buffer setback to the intermittent
creek.
240. The Developer must bear the cost of alteration of any public utility or other facilities
necessitated by the development of the Site or associated construction works external to the
Site.
Public Walkways
241. The Developer shall construct the pathways to link Morwong Drive with Viewland Drive. The
Public Walkways shall be built prior to the Resort use commencing.
242. The Public Walkways shall be a mixture of timber boardwalk, concrete pavement, and other
materials subject to the satisfaction of Manager - Land Development.
243. The Developer is to provide lighting along the Public Walkway from the Morwong Villas to the
southern end of Building Blocks E & F.
Page 40 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.