244. The Public Walkway linking Morwong Drive with Viewland Drive is to have a minimum width of
2 metres up to the Building Block V and a minimum width of 1.6 metres thereafter. In any
sections where the public pathway is proposed to be a shared zone, speed limits shall be
reduced to 10km/hr.
245. Detailed plans and specifications for the Public Walkway shall be prepared to the reasonable
satisfaction of the Manager – Land Development.
246. An easement shall be created over the Public Walkways in favour of the Council. The
easement shall be prepared by the Shire Solicitor at the cost of the Developer. The terms of
the easement shall be to the reasonable satisfaction of the Shire Solicitor. In particular, but
without limitation, the easement shall provide for:
246.1.access for the Council, its servants, agents, employees and others authorised by the
Council (including the general public) to pass and repass over the servient tenement at
times of the day to be agreed by the Council and the Developer;
246.2.the Developer is to be responsible for the repair, maintenance and rebuilding, if
required, of the Public Walkway from Morwong Drive to Viewland Drive.
247. The Developer shall provide sufficient “wayfinding” signage to ensure pedestrians can easily
navigate from Hastings St to Viewland Drive on the proposed public pathways through the
site.
Private Walkways
248. The Developer may construct the private walkways as shown on the Site Plan to the outdoor
viewing platform and pool and deck east of A Block.
249. The private walkways shall be constructed using timber boardwalk, stone, dark coloured
concrete or such other materials subject to the approval of Council. The private walkways
shall be constructed using minimum earthworks.
250. Detailed plans and specifications for the private walkways are to be submitted to Council for
approval prior to the issue of a Development Permit for Operational Works- Landscaping for
the Resort.
Sewerage
251. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
252. The Developer must, at its own cost, construct a series of private reticulation sewers within the
Resort, which are to be discharged into the proposed Council sewer main at an approved
connection point.
Water Supply
253. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
254. The applicant is advised that this development may require the provision of fire hydrants and a
booster pump in accordance with the Building Code of Australia, and consultation may also be
needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
provided. To this end any necessary fire hydrants shall be clearly shown on the plans
submitted for both Plumbing Works and Building Works approval and if a booster pump is
deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
order to provide boosting to the water supply.
255. Water supply to the Resort is to be by connection into existing water mains adjacent to the
site.
Page 41 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.