Negotiated Decision Notice - MCU25 0118 (As Published) · MCU25/0118
Paving Treatment of Vehicle Movement Areas
33. Alternative materials, patterns, or threshold treatments must be used to articulate the
pavement treatment of vehicle movement areas.
Stormwater Drainage
34. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and be generally in accordance with reference document Development Site Plan (MCU-C-
301 Rev B) dated 28/10/2025 prepared by Arcos and Queensland Urban Drainage Manual.
Condition 34 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
35. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
36. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
37. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, be generally in accordance with reference document Earthworks Plan and
Earthworks Sections & Details (MCU-C-201, MCU-C-211, MCU-C-212 Rev A) dated
28/10/2025 prepared by Arcos and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
38. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
39. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
MCU-C-201 A Earthworks Plan prepared by Arcos 28.10.25
MCU-C-211 A Earthworks Sections & Details prepared by 28.10.25
Arocs
MCU-C-212 A Earthworks Sections & Details prepared by 28.10.25
Arcos
MCU-C-301 B Development Site Plan prepared by Arcos 28.10.25
Page 6 of 13
Document Set ID: 24721652
Version: 5, Version Date: 30/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - MCU25 0118 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 183 KB (small file)
- File type
No other editions are linked here.