Appendix 4. Civil Engineering Report [As Published] · 132007.2399
10.5 Existing Electrical Supply (Drawing C1732/07/J/P06) The existing supply conduits run across the proposed site from the eastern most point to the western side of the site adjacent to the bottom of Lake B. These conduits provide power supply to the existing irrigation pumps. This electrical supply will be relocated as part of the electrical design of the proposed development to be completed by Robin Russell and Associates. It is assumed at this early stage that the supply will be realigned along the internal road boundaries and come out adjacent to the irrigation pumps. 10.6 Low Pressure Gas The existing development has provision for gas supply for all developed allotments. This supply comes from existing gas tanks located adjacent to the existing roundabout on Links Drive. Internal gas reticulation mains will be provided to connect to the existing system. This will be provided by a supply main along the access road from the existing main in Links Drive. 10.7 Golf Course Irrigation Pipework This existing irrigation pipework for the golf course crosses the site within the south western corner of the site. This relocation of this pipework will require redesign to provide a suitable outcome and continually maintain the irrigation supply network within the golf course. C1732-07-Engineering Report Page 9 of 10 NOVEMBER 2007 IF/ca TATE PROFESSIONAL ENGINEERS PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 4. Civil Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.