Council archive · source document
Appendix 4. Civil Engineering Report [As Published] · 132007.2399
11.0 12.0 It is anticipated that these works will be carried out in conjunction with the redesign of the proposed new 18» Tee and subsequent construction works which will be required to be completed prior to any development works within the proposed site. GOLF COURSE REDESIGN To enable this development to proceed the existing 18" Tee will be required to be relocated. Preliminary layout for the location of the revised Tee’s have been completed and is attached in Appendix C. It is envisaged that the works required to relocate this Tee and the associated fairway will be completed prior to any works within the proposed development. These works will also be completed in conjunction with the required relocation of the existing services within the site. The design by GNP Golf Design has also considered the development layout in relation to the provision of suitable buffers for the proposed allotments. CONCLUSION The proposed development of Precinct J into a Community Title Scheme parcel with 27 residential allotments has been considered in regard to the impacts upon the site and resultant impact on the surrounding infrastructure. There are no engineering constraints or impediments that cannot be managed during the detailed design phase, construction phase and ongoing Body Corporate Management of the site. C1732-07-Engineering Report Page 10 of 10 NOVEMBER 2007 IF/ca TATE PROFESSIONAL ENGINEERS PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 4. Civil Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.