Council archive · source document
07/0070 - Representation in response to following conditions [As Published] · 132007.70
Page 2 lot which is code assessable development and two detached dwellings which are also code assessable development due to the Biodiversity overlay across the site. It is noted that the Reconfiguration of a Lot Code and the Biodiversity Code do not require the provision of a visitor carparking space for detached houses. Further it is noted that the Probable Solutions of the Detached house Code ($25.1) indicates that only one carparking spaces is tequired to be provided on site. The proposal complies with the probable solution and provides well in excess of the required two spaces for the development by the provision of two double garages which provides carparking for four spaces on the site. Therefore the requirement for the visitor carparking space is not warranted or required by the planning scheme. The applicant is also concemed about the loss of vegetation that would be required as a result of construction of the visitor space. Amended Condition 37 and 43: The applicant requests that Council delete conditions 37 and 43. Condition 67: A registered easement in favour of Council shall be created over any overland flow path within the site that conveys stormwater from a Council road. The easement shall extend the full length and width of the ‘1 in 100 year major storm event surface flow path and be created at no cost to Council. Condition 68. A registered easement in favour of Council shall be created over any Stormwater drainage pipes within the site that convey stormwater from any adjoining property (for example, where drainage pipes are provided within the site to prevent adjacent properties from additional ponding/iooding due to the subject site being filled). The easement is to be centrally located over the pipework with a minimum width of 1.5m or be of sufficient width to ensure all associated pits and pipes are wholly contained within the easement. The terms of the easement shail include the responsibilities on the beneficiaries of the easement to maintain the drain so as to be operational — at all times. Representation to Conditions 67 and 68: The applicant is concerned about the implications of these conditions on the development. The applicant has not yet commenced final drawings for the development and is concemed that the conditions may be quite onerous and severely impact on the overall design of the buildings. Further the implications of this condition on stormwater requires extensive engineering consideration and design which would be more appropriately dealt with as part of any application for operational works. The applicants designer therefore requests that the conditions be deleted from the Reconfiguration of a Lot approvals and be incorporated into any Operational Works application. Amended Condition 67 and 68: ‘delete’ The applicants therefore request that Council issues a negotiated decision notice which amends the original conditions as suggested above. Please do not hesitate in contacting our office if Council requires any further information. Yours faithfully INC OLe~. Nadine Gorton Senior Planner Martoo Consulting Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0070 - Representation in response to following conditions [As Published]Related documentApplication case desk ↗
07/0070 - Representation in response to following conditions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 119 KB (small file)
- File type
No other editions are linked here.