Skip to the record
The gold standard in government transparency.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

     3.3.      Environmental Control Plan
            The key features of the environmental management for this project is to keep good control
            on the following;

     •   waterways and drains
     •   erosion and sediment controls
     •   work areas, machinery or vehicle parking, waste management areas, fuel and chemical
         stores
     •   vegetation requiring protection
     •   traffic management
     •   monitoring locations
     •   environmentally sensitive areas on and adjacent to the site

     3.4. Environmental Schedules
            This EMP refers to a number of environmental schedules comprising forms, registers and
            checklists. They are listed below and included in Attachment 2.

                  1. Site Environmental Induction Register
                  2. Site Environmental Inspection Checklist

                  3. Environmental Complaint Form
                  4. Non-Conformance Report Form
                  5. Hazardous Substances Register
                  6. Safety Data Sheets (SDS) Register
                  7. Waste Register



4.          Monitor and Review
     4.1. Environmental Monitoring
         M&J Marine will monitor the environmental controls listed in Section 3.2 through regular
         site environmental inspections.

         Site environmental inspections will be undertaken halfway through the job and will be
         recorded by the Site Supervisor on the Site Inspection Checklist (see Attachment 2).

     4.2. Environmental Auditing
            Planned and documented audits aimed at evaluating the environmental conformance of the
            project will be carried out by SMADS. Any deficiencies identified during the audits shall
            be documented and actioned in accordance with SMADS corrective action process (see
            Section 4.5).

M&J Marine Services                             Page 18                   Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.