Skip to the record
The gold standard in government transparency.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

          SITE ENVIRONMENTAL INSPECTION CHECKLIST
PROJECT DETAILS
Project
Name:
Contact
Name:                                                        Telephone:

Email                                                        Date:

ENVIRONMENTAL ISSUES
                                                        N/
Erosion and Sediment Control                   Yes No        Comments
                                                        A
Has an erosion and sediment control plan
been created.
Are sediment and control measures in
place for construction works e.g. sediment
traps, sediment fences etc.
Are these being maintained and kept in
correct working order.
Have materials been contained or placed
in designated areas to be away from
stormwater drains/runoff.
Are designated washout areas in place
away from storm water drains.
Is relevant protection in place surrounding
flora to stop any damage.
Is the site maintained and cleared away
daily of all soil, earth, mud, clay and
concrete waste that may cause an
environmental issue.
                                                        N/
Waste Management                               Yes No        Comments
                                                        A
Has a Waste Management Plan been
created and implemented.
Have stock piles or designated waste areas
been created.
Is the waste being stored in such an area as
not to pollute or contaminate stormwater
drains.
Have excess materials been recycled,
reused or returned.



M&J Marine Services                              Page 25                  Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.