Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                      N/
Hazardous Materials                          Yes No        Comments
                                                      A

Are spill kits available and held on site.
Are spills attended to and cleaned up
immediately.
Are procedures in place noting the correct
methods for removing Asbestos.
Is there a designated storage area for
hazardous materials where leaks can’t
flow to open ground or drains.
Are all hazardous material containers
sealed properly and no leaks evident.
Are Safety Data Sheet (SDS) on site for
all hazardous materials
                                                      N/
Air Quality                                  Yes No        Comments
                                                      A
Does all plant and equipment comply with
the relevant codes and emission standards
for air quality
                                                      N/
Noise Management                             Yes No        Comments
                                                      A
Are procedures in place to minimise noise
to workers, site and surrounding areas.
Does all plant and equipment comply with
the relevant codes, guidelines and
standards for noise control

 Company Representative Name:__________________________________________________

Company Representative Signature:_________________________________________________

         Date: ___________________________




M&J Marine Services                            Page 26                Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.