Original source · versioned page text
220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
4.Management responsibili es
M&J Marine Services Pty Ltd takes responsibility for delivering biosecurity awareness
informa on and material for project personnel (e.g. induc on training, toolbox and pre-start
mee ngs)
Ensuring all vessels (barges) are cleaned and inspected before deployment
Repor ng possible biosecurity threats from related works to the Contractor (The Nature
Conservancy) and authori es.
5.Biosecurity hazards
Poten al biosecurity hazards from this project include the transloca on of marine plants and
biofouling organisms on barges used for the transport and deployment of rock.
6.Site/premise details
Work site loca ons
Version: July 2022 Page 4
ti
ti
ti
ti
ti
ti
ti
ti
ti
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.