220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
The construc on load-out site is located on Hilton Esplanade, Noosaville.
7.Opera onal procedures
In this sec on detail the procedures that will provide assurance that the biosecurity integrity of
cargo is maintained.
Equipment Handling and Cleaning /treatment
Two barges will be relocated from New South Wales to Noosa, Queensland
The barges will be loaded onto trucks and transported to Noosa by road.
During loading, each barge will be pressure washed and sprayed with Virkon. Virkon is a premier
broad spectrum virucidal veterinary disinfectant that is recognised by industry and governments
worldwide as a disinfectant of choice for livestock disease preven on and control.
Each barge will then be transported to Noosa and air dried for 72 hours.
Virkon will then be reapplied to the barges on arrival in Noosa as an addi onal precau on.
Version: July 2022 Page 5
ti
ti
ti
ti
ti
ti
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.