220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

1.          Background
     1.1. Introduction
                This Environmental Management plan “EMP” specifies, at a strategic level, the
                safeguards and controls proposed in order to manage potential environmental
                impacts from any works carried out by M&J Marine During Oyster Reef
                Rehabilitation projects In Noosa.

     1.2. Environmental policy
        M&J Marine Services is committed to leading the industry in minimising the impact of its activities
        on the environment.

        In particular, we will achieve this through our commitment to:
        • comply with all relevant legislation and regulations;
        • regularly review the environmental impact of our activities, endeavour to reduce our overall
          environmental impact and prevent waste using best practice techniques
        • Integrate this Environmental Policy into work practices
        • Maintain adequate hazardous waste materials management and disposal procedure records;
        • Ensure that all accidents and incidents, which pose potential harm to the environment, are reported
          to the relevant statutory authority, that internal investigations are carried out, and that
        • recommendations arising out of investigations are implemented where practicable.
        • Ensure that all employees receive training to perform their tasks in a manner designed to comply
          with legislative requirements and minimise any negative impact on environment;
        • Ensure that employees and contractors adopt a high standard on environmental responsibility in
          the workplace and off the job;
        • Ensure that all contractors are inducted and have a site induction for the site that they will be
          working at.
        • Consult with employees about environmental matters which may affect them;
        • Implement the Environmental Management Policy in consultation with employees

All employees are responsible to ensure that they comply with the policies and procedures of the Company.
This Policy applies to all employees and contractors of M&J Marine Services

     1.3.     Project Description
                This is a general EMP for all construction works either from the water or on the land, Job
                specific environmental considerations and controls will be detailed in the JSEA and detailed
                within the morning toolbox talks as seen necessary.
                EMPs for Future works that require a project specific EMP will include;

                  • Overview of the project
                  • Scope of Construction works
                  • Description of the construction (disturbance) footprint
                  • Timing of the works
                  • Site Plan




M&J Marine Services                                Page 5                     Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.