Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes



 Specific outcome                                   A probable solution                                              Comment
                                                    Character and amenity (generally)—prescribed tidal work in a canal
 1.1 Prescribed tidal works in a canal are          The design and construction of the prescribed tidal works is
 compatible with their location, having regard to   consistent with the following standards—                       Not applicable.
 the following—                                     (a) subject to paragraph (c), prescribed tidal works do not
                                                    extend past the side boundary or extended side boundary of the Not in a canal.
 (a) the character and amenity of the works’        lot connected to the works;
 immediate surroundings and the locality within
 which the works are located;                       (b) subject to paragraph (c)—
                                                    (i) for prescribed tidal works for a private purpose—the works
 (b) if the relevant planning scheme states the     are not roofed; or
 desired character or amenity for the works’
 immediate surroundings or the locality within      (ii) for prescribed tidal works for a non-private purpose—the
 which the works are located—the stated             works are not roofed unless they are the main access to land;
 desired character or amenity.
                                                    (c) if a relevant planning scheme standard is more stringent
                                                    than the standard mentioned in paragraph (a) or (b)—the
                                                    relevant planning scheme standard, to the extent it is more
                                                    stringent than the standard mentioned in paragraph (a) or (b);

                                                    (d) any other relevant planning scheme standard that is not
                                                    inconsistent with the standards mentioned in paragraphs (a) to
                                                    (c).




                                                                                                                                     1
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 28 pages

Page 2

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                Character and amenity (generally)—prescribed tidal work not in a canal
 2.1 Prescribed tidal works not in a canal are   The design and construction of the prescribed tidal works is       Complies with Performance Outcome 2.1. Due to the
 compatible with their location, having regard toconsistent with the following standards—                           nature of the project the nominated Acceptable
 the following—                                  (a) subject to paragraph (d), prescribed tidal works do not        Outcomes are not considered to be suitable but have
 (a) the character and amenity of the works’     extend past the side boundary or extended side boundary of the     been considered.
 immediate surroundings and the locality within  lot connected to the works;
 which the works are located;                                                                                       The works are to restore rock oyster ecosystems
                                                 (b) subject to paragraph (d), prescribed tidal works are the only  throughout the Noosa River estuary that meet site
 (b) if the relevant planning scheme states the  works of their type along the edge of the tidal water fronting the suitability criteria and positively interact with current
 desired character or amenity for the works’     lot connected to the works;                                        human uses. As the Noosa River was historically
 immediate surroundings or the locality within                                                                      characterised by significant oyster ecosystems, they
 which the works are located—the stated          (c) subject to paragraph (d)—
                                                                                                                    are considered to be consistent with the character and
 desired character or amenity.                   (i) for prescribed tidal works for a private purpose—the works
                                                                                                                    amenity of the works’ immediate surroundings and the
                                                 are not roofed; or
                                                                                                                    locality in which the works are located. Restoration
                                                 (ii) for prescribed tidal works for a non-private purpose—the      Zones have been developed based on Habitat
                                                 works are not roofed unless they are the main access to land;      Suitability parameters and Restoration Suitability
                                                                                                                    parameters as detailed in the Project Restoration Plan.
                                                 (d) if a relevant planning scheme standard is more stringent
                                                 than the standard mentioned in paragraph (a), (b) or (c)—the       (a) The Restoration Zones include large areas of the
                                                 relevant planning scheme standard, to the extent it is more        Noosa River and as such are adjacent to multiple Lots.
                                                 stringent than the standard mentioned in paragraph (a), (b) or
                                                 (c);                                                               (b) The Works are expected to be implemented
                                                                                                                    progressively with Phase 1 currently planned and
                                                 (e) any other relevant planning scheme standard that is not        Phase 2 to occur over time as funds become available.
                                                 inconsistent with the standards mentioned in paragraphs (a) to     As such, Phase 2 could include extension of Phase 1
                                                 (d).                                                               reef habitat which could include placement of
                                                                                                                    additional works of their type adjust to the frontage of
                                                                                                                    the same lots as Phase 1.

                                                                                                                      (c) The works are not roofed.




                                                                                                                                                                                2

Page 3

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                              Character and amenity (height, scale and size)
 3.1 Prescribed tidal works are of a height,       The height, scale and size of the prescribed tidal works is   Complies with Performance Outcome 3.1
 scale and size to ensure the works are            consistent with each relevant planning scheme standard.
 compatible with the character and amenity of                                                                        (a) The works are of a height, scale and size that
 their location, having regard to the following—                                                                         is consistent with natural oyster reefs which
 (a) the height, scale and size of the natural                                                                           have historically been present within the
 features of the works’ immediate surroundings                                                                           Noosa River. Crest heights are relative to
 and the locality within which the works are                                                                             tidal levels (Mean High Water Springs) for
 located;                                                                                                                individual sites.

 (b) the height, scale and size of the existing                                                                      (b) The works are of a lower height and level
 buildings or other structures in the works’                                                                             than other rock structures within the Noosa
 immediate surroundings and the locality within                                                                          River although extend further seaward than
 which the works are located;                                                                                            seawall type structures in order to provide
                                                                                                                         larger area of habitat.
 (c) if the relevant planning scheme states the
 desired height, scale or size of buildings or
 other structures in the works’ immediate
 surroundings or the locality within which the
 works are located—the stated desired height,
 scale or size.




                                                                                                                                                                          3

Page 4

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                Character and amenity (materials and colours)
 4.1 The materials used for, and the colours         The materials used for, and colours of, the prescribed tidal works     Complies with Performance Outcome 4.1
 of, prescribed tidal works are compatible with      are consistent with each relevant planning scheme standard.
 the character and amenity of the works’                                                                                    The works include the placement of locally sourced
 location, having regard to the following—                                                                                  rock and oyster shell as detailed in ICM drawing
 (a) the natural features of the works’                                                                                     SROR-2021-02.
 immediate surroundings and the locality within
 which the works are located;                                                                                                   a)   The materials are consistent with natural
                                                                                                                                     rocky rubble reefs which are present within
 (b) the existing buildings or other structures in                                                                                   some area of the Restoration Zones.
 the works’ immediate surroundings and the
 locality within which the works are located;                                                                                   b)   The materials are consistent with rock
                                                                                                                                     erosion protection structures located
 (c) if the relevant planning scheme states the
                                                                                                                                     throughout the Noosa River.
 desired materials to be used for, or desired
 colours of, buildings or other structures in the
 works’ immediate surroundings or the locality
 within which the works are located—the stated
 desired materials or colours.

                                                                                       Lighting
 5.1 Lighting, other than an aid to navigation,      The lighting for the prescribed tidal works, other than an aid to      Complies with Performance Outcome 5.1
 for prescribed tidal works is installed in a way    navigation, is consistent with the following standards—
 to ensure the security and safe use of the          (a) subject to paragraph (c), lighting for prescribed tidal works is   The works are oyster habitat and will not be lit.
 works without causing significant adverse           hooded and directed downwards;
 effects on the amenity of the locality within
 which the works are located.                        (b) subject to paragraph (c), each lighting standard, to the
                                                     extent relevant;

                                                     (c) if a relevant planning scheme standard is more stringent
                                                     than the standard mentioned in paragraph (a) or (b)—the
                                                     relevant planning scheme standard, to the extent the standard is
                                                     more stringent than the standard mentioned in paragraph (a) or
                                                     (b);

                                                     (d) any other relevant planning scheme standard that is not
                                                     inconsistent with the standards mentioned in paragraphs (a), (b)
                                                     and (c).



                                                                                                                                                                                   4

Page 5

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                                       Signage
 6.1 A sign erected or otherwise placed in           A sign erected or otherwise placed in position for prescribed tidal    Complies with Performance Outcome 6.1
 position for prescribed tidal works, other than     works, other than a sign erected or placed for safety reasons or
 a sign erected or placed for safety reasons or      under an Act, is consistent with the following standards—              Signage and aids to navigation are to be installed as
 under an Act—                                       (a) subject to paragraph (c), a sign erected or placed in position     required by MSQ permit conditions. Section 7 of the
 (a) is compatible with the character and            for identifying prescribed tidal works, or the owner of the works,     Project Restoration Plan outlines navigation aid type,
 amenity of the works’ immediate surroundings        is the only sign erected or placed in position for identifying the     signage specifications and signage certification. This
 and the locality within which the works are         works or owner;                                                        selection has been informed by pre-lodgement
 located; and                                                                                                               discussions with MSQ.
                                                     (b) subject to paragraph (c), a sign erected or otherwise placed
 (b) is not a dominant feature of the works,         in position for prescribed tidal works is integrated into the design       a)   The aids to navigation are to be of a type
 unless the dominance is for safety reasons.         and construction of the works;                                                  consistent with standard MSQ buoys and are
                                                                                                                                     therefore compatible with the character and
                                                     (c) if a relevant planning scheme standard is more stringent
                                                                                                                                     amenity of the works’ locality. SCG has
                                                     than the standard mentioned in paragraph (a) or (b)—the
                                                                                                                                     certified that the signage is consistent with
                                                     relevant planning scheme standard, to the extent it is more
                                                                                                                                     the requirements of the Coastal Protection
                                                     stringent than the standard mentioned in paragraph (a) or (b);
                                                                                                                                     and Management Act.
                                                     (d) any other relevant planning scheme standard that is not
                                                     inconsistent with the standards mentioned in paragraphs (a), (b)           b)   The dominance of the signage will be based
                                                     and (c).                                                                        on navigational safety requirements.

                                                                      Earthwork, vegetation & rehabilitation
 7.1 Excavation and filling for prescribed tidal     The earthwork and filling for the prescribed tidal works is            Not applicable.
 works—                                              consistent with each relevant planning scheme standard.
 (a) is carried out only to the extent reasonably                                                                           The works do not include removal of any material,
 necessary for the works; and                                                                                               excavation or filling.

 (b) does not have a significant adverse effect
 on—
 (i) the natural features, including the banks, of
 the tidal water in the works’ immediate
 surroundings; or

 (ii) the level of the surface of the land under
 the tidal water in the works’ immediate
 surroundings or any foreshore near the works.




                                                                                                                                                                                     5

Page 6

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 7.2 The location and construction of             Vegetation on land affected by the prescribed tidal works is dealt   Complies with Performance Outcome 7.2
 prescribed tidal works ensures vegetation is     with in a way consistent with the following standards—
 cleared or disturbed only to the extent          (a) subject to paragraph (b), the clearing or disturbance of         The works only allow minor temporary impacts to
 reasonably necessary for the works.              vegetation for a purpose associated with the construction of         marine plants and terrestrial vegetation at the
                                                  prescribed tidal works, including, for example, parking for          Tewantin site (Refer ICM Drawing NROR-2021-04).
                                                  construction or workers’ vehicles or stockpiling of construction     While avoidance of this impact is possible, it is
                                                  materials—                                                           anticipated the works will provide considerable
                                                  (i) is avoided; or                                                   enhancement to the existing degraded habitat in this
                                                                                                                       location. The impact of the works is limited to the
                                                  (ii) if the clearing or disturbance of vegetation for a purpose      footprint of the individual reef patches, such that the
                                                  associated with the construction of the works can not be             works will retain any marine plants present in access
                                                  avoided—the clearing or disturbance is limited to the smallest       gaps between reef patches.
                                                  area of land reasonably necessary for the purpose;

                                                  (b) any other relevant planning scheme standard that is not
                                                  inconsistent with the standard mentioned in paragraph (a).

 7.3 After the construction of prescribed tidal   Land or vegetation affected by the prescribed tidal works is dealt   Complies with Performance Outcome 7.3
 works, any land damaged or destabilised by,      with in a way consistent with the following standards—
 and any vegetation damaged, destroyed or         (a) subject to paragraph (b)—                                        The works only allow minor temporary impacts to the
 removed by, the construction of the works is     (i) land surfaces damaged or destabilised by the prescribed tidal    significantly degraded habitat at the Tewantin site
 rehabilitated.                                   works are restored and stabilised; and                               (Refer ICM Drawing NROR-2021-04). The site will be
                                                                                                                       extensively habilitated with rocky substrate and oyster
                                                  (ii) vegetation damaged, destroyed or removed by prescribed          cultch as part of the proposed works. For detail, refer
                                                  tidal works is replaced with native vegetation for the locality      ICM drawings and Project Restoration Plan.
                                                  within which the works are located, to the extent it is reasonably
                                                  practicable to replace the vegetation with native vegetation;

                                                  (b) if a relevant planning scheme standard is more stringent
                                                  than the standard mentioned in paragraph (a)—the relevant
                                                  planning scheme standard, to the extent it is more stringent than
                                                  the standard mentioned in paragraph (a);

                                                  (c) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) and
                                                  (b).




                                                                                                                                                                                 6

Page 7

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                             Public access - availability
 8.1 Prescribed tidal works do not have a            The design and construction of the prescribed tidal works is        Complies with Performance Outcome 8.1
 significant adverse effect on the availability of   consistent with the following standards—
 public access to, along or across State coastal     (a) subject to paragraph (b), prescribed tidal works do not         The design provides for a minimum distance of 10m
 land.                                               involve the erection or placement of any physical barrier           from foreshore access to maintain public use of and
                                                     preventing existing public access to, along or across State         access to and along state coastal land. Refer ICM
                                                     coastal land near the works;                                        drawing NROR-2021-00.

                                                     (b) if a relevant planning scheme standard is more stringent        At the Tewantin site (ICM drawing NROR-2021-04)
                                                     than the standard mentioned in paragraph (a)—the relevant           upstream of the boat ramp, there is an opening in the
                                                     planning scheme standard, to the extent it is more stringent than   vegetation that could provide public access to the
                                                     the standard mentioned in paragraph (a);                            structure if desirable. In this location a wider 4m
                                                                                                                         access gap has been provided between shoreward
                                                     (c) any other relevant planning scheme standard that is not
                                                                                                                         reef patches to facilitate safe access by a larger
                                                     inconsistent with the standards mentioned in paragraphs (a) and
                                                                                                                         number of persons if this was desirable (e.g. for
                                                     (b).
                                                                                                                         education purposes).
                                                                              Public access - safety
 9.1 The location and design of prescribed           Public access to State coastal land near the prescribed tidal       Complies with Performance Outcome 9.1
 tidal works does not adversely affect the           works is consistent with each relevant planning scheme
 safety of members of the public accessing           standard.                                                           Members of the public could approach by vessel or
 State coastal land.                                                                                                     from land (for some sites). There are gaps between
                                                                                                                         the reef patches at the seabed and this would allow
                                                                                                                         persons to transit between the reef patches.

                                                                                                                         The design includes
                                                                                                                         -   Crest level at Mean High Water Springs will result
                                                                                                                             in the works being exposed at most tides,
                                                                                                                             although some settlement is expected initially
                                                                                                                             which may result in lowering of crest levels.
                                                                                                                         -   Provision of a navigation buoy and signage at
                                                                                                                             each site to reduce the risk of vessel collision with
                                                                                                                             the works, impacts from anchoring and warn
                                                                                                                             against consuming oysters from the works.
                                                                                                                         -   Gaps between reef patches to be 1-4m wide to
                                                                                                                             allow for careful transit of monitoring personnel
                                                                                                                             and public. This gap widens at water level due to
                                                                                                                             batter slopes. A wider gap (minimum 4m) is
                                                                                                                             provided where land-based access is viable and

                                                                                                                                                                                     7

Page 8

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                                 educational visits could be considered (including
                                                                                 at Tewantin see NROR-2021-04).
                                                                             -   Monitoring and Maintenance.

                                                                             A Safety in Design assessment has been undertaken.




                                                                                                                                     8

Page 9

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           Navigable access to, or egress from, non-tidal work lots
 10.1 Prescribed tidal works that are for a        The design and construction of the prescribed tidal works is     Not applicable.
 private purpose do not adversely affect           consistent with the following standards—
 navigable access to, or navigable egress from,    (a) subject to paragraph (b), prescribed tidal works—            The works are not for a private purpose.
 any lot that adjoins, or is in the immediate      (i) for a lot connected to the works for which there is a water
 surroundings of, a lot connected to prescribed    allocation area —are not constructed outside the water
 tidal works.                                      allocation area; and

                                                   (ii) for a lot connected to works for which there is no water
                                                   allocation area —are no closer than 1.5m to that lot’s side
                                                   boundary or extended side boundary;

                                                   (b) if a relevant planning scheme standard is more stringent
                                                   than the standard mentioned in paragraph (a)—the relevant
                                                   planning scheme standard, to the extent it is more stringent than
                                                   the standard mentioned in paragraph (a).

                                                  Infrastructure, including access, parking, sewerage and water services
 11.1 Prescribed tidal works have appropriate       The infrastructure for prescribed tidal works is consistent with Complies with Performance Outcome 11.1
 infrastructure, including, in particular, road     each relevant planning scheme standard.
 access, parking facilities, sewerage services                                                                       The nature of the works (i.e. restoration of oyster
 and water services, having regard to the                                                                            ecosystems) is such that infrastructure, parking,
 following—                                                                                                          sewerage and water services are not required.
 (a) the nature and scale of the works;

 (b) the number of people that may be on or at
 the works at any given time;

 (c) the number of vehicles that may be on or
 moored at the works at any given time;

 (d) the protection of any foreshores near the
 works and the vegetation and marine plants
 on the foreshores.




                                                                                                                                                                           9

Page 10

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                         Design, construction and safety - all prescribed tidal work
 12.1 Prescribed tidal works are designed and      The design and construction of the prescribed tidal works is      Alternative Solution for Performance Outcome 12.1.
 constructed in a way to ensure they are           consistent with the following standards—
 structurally sound, having regard to the          (a) subject to paragraph (c), each Australian Standard relevant   The rock substrate has been designed by ICM to be
 following—                                        to the design or construction of structures, to the extent        structurally sound, having regard to the following:
 (a) relevant engineering standards;               requirements stated in the Standard apply to the design or             (a) Relevant Australian Standards and
                                                   construction of prescribed tidal works;                                     internationally recognised best practice
 (b) the location of the works;                                                                                                guidelines. The structure has been certified
                                                   (b) subject to paragraph (c), the projected sea level rise is               by an RPEQ engineer.
 (c) the purpose for which the works are to be     factored into the design and construction of the prescribed tidal      (b) Site-specific design details have been
 used;                                             works;                                                                      provided for Phase 1. The detailed design of
 (d) the impact of flooding, storm tide,                                                                                       Phase 2 is required to be undertaken by a
                                                   (c) if a relevant planning scheme standard is more stringent
 overtopping by waves, projected sea level                                                                                     coastal engineer, including consideration of
                                                   than the standard mentioned in paragraph (a) or (b)—the
 rise, tidal influences and hydrodynamic forces;                                                                               site-specific parameters and selection of a
                                                   relevant planning scheme standard, to the extent it is more
                                                                                                                               stabile rock grading. Refer ICM drawing
                                                   stringent than the standard mentioned in paragraph (a) or (b).
 (e) the design life of the works;                                                                                             NROR-2012-02 (particularly notes 1 & 2).
                                                                                                                          (c) The works are to provide a suitable substrate
 (f) the dead load of the works and the                                                                                        for habitat enhancement and restore rock
 intended live load for the works;                                                                                             oyster ecosystems throughout the Noosa
                                                                                                                               River.
 (g) the impact of hydrostatic pressures on the                                                                           (d) The design considers forces resulting from
 works;                                                                                                                        tidal and flood flows as well as wave action
 (h) the stability of individual components of                                                                                 and vessel wake. Due to the nature of the
 the works, including, for example, boulders,                                                                                  works, crest levels have been selected to
 concrete blocks or sandbags.                                                                                                  optimise habitat suitability for the target
                                                                                                                               species. High tides, storm tides and flooding
                                                                                                                               would be expected to result in overtopping of
                                                                                                                               the structure. The need for future adaptation
                                                                                                                               in response to climate change will be
                                                                                                                               dependent on monitoring of ecosystem health
                                                                                                                               over time.
                                                                                                                          (e) The design life of the works is 50 years,
                                                                                                                               although maintenance, modification or
                                                                                                                               adaptation may be required during this time in
                                                                                                                               response to monitoring of habitat
                                                                                                                               development.
                                                                                                                          (f) Stability of rock structures has been
                                                                                                                               determined in accordance with best practice
                                                                                                                               guidelines. It is not intended for the works to

                                                                                                                                                                            10

Page 11

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                                                                              be trafficable by pedestrians as this would
                                                                                                                              negatively impact on the habtitat.
                                                                                                                          (g) The design considers that the works will be
                                                                                                                              underwater at times and subject to
                                                                                                                              hydrostatic pressures, but given the nature of
                                                                                                                              the works this is not critical to the design.
                                                                                                                          (h) The stability of individual rocks has been
                                                                                                                              determined based on internationally
                                                                                                                              recognised world’s best practice guidelines.
                                                                                                                              Rock structure are inherently flexible and able
                                                                                                                              to accommodate some movement or
                                                                                                                              displacement of individual boulders, which
                                                                                                                              may occur during a design event. This is to
                                                                                                                              be addressed through maintenance if
                                                                                                                              required.

                                                                                                                      The oyster shell is not inherently stable in the design
                                                                                                                      site conditions, but shell stability has been optimised
                                                                                                                      by the use of whole shell, the mixing of shell with the
                                                                                                                      rocky substrate to secure it within the rocky matrix, the
                                                                                                                      placement of loose oyster cultch as a single layer by
                                                                                                                      hands into interstitial voids and the capping of the
                                                                                                                      volume of loose shell placed to 10kg/m3. Refer ICM
                                                                                                                      drawing NROR-2021-02 Notes 3 & 5 for placement
                                                                                                                      requirements. Where monitoring identifies displaced
                                                                                                                      shell that is more than 5m outside the Restoration Site,
                                                                                                                      it is to be removed in the event that it is resulting in
                                                                                                                      negative impacts. Refer ICM drawing NROR2021-00
                                                                                                                      Note 4.2 and Project Restoration Plan.

 12.2 Prescribed tidal works do not adversely      The design and construction of the prescribed tidal works is       Complies with Performance Outcome 12.2.
 affect the structural integrity of any existing   consistent with the following standards—
 revetment or seawall or another existing          (a) subject to paragraph (b), prescribed tidal works, including    The works allow for a minimum distance of at least
 structure.                                        any abutment, piling or other structure connected with the         30m from existing tidal works. As such, it is not
                                                   works—                                                             anticipated that the works will impact on any existing
                                                   (i) do not place an additional load on any existing revetment or   structure.
                                                   seawall or another existing structure; or



                                                                                                                                                                               11

Page 12

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                 (ii) can be structurally supported by an existing revetment or
                                                 seawall or another existing structure;

                                                 (b) if a relevant planning scheme standard is more stringent
                                                 than the standard mentioned in paragraph (a)—the relevant
                                                 planning scheme standard, to the extent it is more stringent than
                                                 the standard mentioned in paragraph (a).

 12.3 Prescribed tidal works are designed and    The design and construction of the prescribed tidal works is        Complies with Performance Outcome 12.3.
 constructed in a way to ensure they do not      consistent with the following standards—
 adversely affect the stability of the bed and   (a) subject to paragraph (b), prescribed tidal works do not         The purpose of the works is not to provide erosion
 banks of tidal water.                           cause, by changing the flow of water, the removal of, or            protection, but to restore rock oyster ecosystems
                                                 disturbance to, the sediment on the bed and banks of tidal water;   throughout the Noosa River.

                                                 (b) if a relevant planning scheme standard is more stringent        However, Concept Layouts 2 & 3 (segmented
                                                 than the standard mentioned in paragraph (a)—the relevant           longshore modules most suitable for locations which
                                                 planning scheme standard, to the extent it is more stringent than   are vulnerable to erosion and adopted for Phase 1) are
                                                 the standard mentioned in paragraph (a).                            anticipated to act as a segmented reef patches and
                                                                                                                     provide some sheltering to the shoreline from wave
                                                                                                                     action and vessel wake and result in reduced erosion.
                                                                                                                     The layout is aligned with the river flows and provide
                                                                                                                     gaps between reef patches to limit potential for
                                                                                                                     impacts on natural processes.

                                                                                                                     The proposed works are not expected to adversely
                                                                                                                     affect the stability of the bed or banks of tidal waters.
                                                                                                                     Some settlement or localised scour on the seaward
                                                                                                                     side may occur and the works are expected to be
                                                                                                                     reprofiled or topped up in response.

 12.4 Prescribed tidal works are designed and    The design and construction of the prescribed tidal works is        Complies with Performance Outcome 12.3.
 constructed using materials suitable for        consistent with the following standards—
 marine environments, having regard to their     (a) subject to paragraph (b), each Australian Standard relevant     The rock utilised is to be suitable for use in the marine
 ability to resist the following—                to the materials that should be used, or the measures that          environment. It is not vulnerable to attack by marine
 (a) attack by marine organisms;                 should be taken to treat materials used, for structures, to the     organisms, corrosion, deterioration, abrasion,
                                                 extent the requirements stated in the Standard apply to             immersion in seawater or wave action within the life of
 (b) corrosion;                                  structures located in a marine environment;                         the works. For specifications, refer ICM drawing
                                                                                                                     NROR-2021-02 Note 2.1.
                                                 (b) if a relevant planning scheme standard is more stringent
                                                 than the standard mentioned in paragraph (a)—the relevant

                                                                                                                                                                                 12

Page 13

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 (c) deterioration or breakage resulting from       planning scheme standard, to the extent it is more stringent than    The cured oyster shell was originally sourced from
 exposure to environmental conditions               the standard mentioned in paragraph (a).                             within the marine environment and is suitable for use
 including, for example, the following—                                                                                  in the Noosa River subject to curing in accordance
 (i) abrasion;                                                                                                           with relevant legislation. For specifications, refer ICM
                                                                                                                         drawing NROR-2021-02 and Project Restoration Plan.
 (ii) immersion in seawater;

 (iii) wave action.

 12.5 Prescribed tidal works are designed and       The design and construction of the prescribed tidal works is         Complies with Performance Outcome 12.5.
 constructed in a way to ensure they do not         consistent with the following standards—
 adversely affect the operation or maintenance      (a) subject to paragraph (c), vessels moored at prescribed tidal     The works are seaward of MHWS and will not
 of any existing stormwater outlet.                 works do not impede the discharge of stormwater;                     adversely affect the operation or maintenance of any
                                                                                                                         existing stormwater outlet.
                                                    (b) subject to paragraph (c), prescribed tidal works do not
                                                    restrict access to any stormwater outlet;

                                                    (c) if a relevant planning scheme standard is more stringent
                                                    than the standard mentioned in paragraph (a) or (b)—the
                                                    relevant planning scheme standard, to the extent it is more
                                                    stringent than the standard mentioned in paragraph (a) or (b).

 12.6 Prescribed tidal works are designed and       The design and construction of the prescribed tidal works is         Complies with Performance Outcome 12.6 (subject to
 constructed in a way to ensure they do not         consistent with the following standards—                             monitoring)
 adversely affect the water quality of tidal        (a) subject to paragraph (b), each Australian Standard relevant
 water, including, in particular, as a result of—   to the design or construction of structures under, within or over    As oysters are filter feeders, the works would be
 (a) release, into the tidal water, of materials    tidal water, to the extent the requirements stated in the Standard   expected to result in improved water quality outcomes
 used in the construction of the works; or          are directed at maintaining the water quality of tidal water;        for the Noosa River.

 (b) disturbance to the sediment on the bed         (b) if a relevant planning scheme standard is more stringent         During construction, rock placement activities may
 and banks of the tidal water; or                   than the standard mentioned in paragraph (a)—the relevant            result in some suspension of sediment. Construction
                                                    planning scheme standard, to the extent it is more stringent than    materials are to be clean and free of topsoil or organic
 (c) exposure to acid sulphate soils.               the standard mentioned in paragraph (a).                             material. Construction is to be managed to minimise
                                                                                                                         potential for impacts and monitoring of sensitive
                                                                                                                         receptors is to be undertaken. Detailed requirements
                                                                                                                         are outlined in ICM drawing NROR-2021-02 and
                                                                                                                         section 6.4 of the Project Restoration Plan.

                                                                                                                             a)   Construction waste or excess materials are
                                                                                                                                  not to be released into tidal waters.

                                                                                                                                                                                13

Page 14

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                                                                       b)   Works do not include disturbance of sediment
                                                                                                                            on the seabed or banks. Incidental
                                                                                                                            disturbance as a result of rock placement is
                                                                                                                            to be minimised and monitored as described
                                                                                                                            above.

                                                                                                                       c)   Works do not include disturbance or
                                                                                                                            exposure of sediment (Acid Sulphate Soils or
                                                                                                                            otherwise).

 12.7 Prescribed tidal works are designed and   The design and construction of the prescribed tidal works is       Complies with Performance Outcome 12.7.
 constructed in a way to ensure they are safe   consistent with the following standards—
 for persons using the works.                   (a) subject to paragraph (d), each Australian Standard relevant    The works have been designed to be stable and well
                                                to the design or construction of structures, the materials that    interlocked with gaps between reef patches that are 1-
                                                should be used, or the measures that should be taken to treat      4m wide at the seabed. The works are considered to
                                                materials used, for structures, to the extent the requirements     be generally safe for an aware person monitoring the
                                                stated in the Standard are directed at ensuring any surface of     works and/or carefully traversing between individual
                                                prescribed tidal works on which a person may stand or walk is—     modules. The modules themselves are not intended
                                                (i) not slippery; and                                              to be traversed and are designed to have uneven
                                                                                                                   surfaces with voids and loose oyster shell to provide a
                                                (ii) does not have any feature that may cause the person to trip   suitably complex habitat that has the potential to
                                                or fall;                                                           provide a trip hazard. Over time, these surfaces are
                                                                                                                   intended to be inhabited by oysters and other species
                                                (b) subject to paragraph (d), any part of prescribed tidal works
                                                                                                                   which could result in the rocks becoming both slippery
                                                that is unsafe for persons using the works is surrounded by
                                                                                                                   and sharp. These risks are inherent with the natural
                                                adequate barriers to deter persons from entering the part;
                                                                                                                   type of habitat being restored and while they have
                                                (c) subject to paragraph (d), each Australian Standard relevant    been minimised where possible they cannot be
                                                to the design or construction of structures, to the extent the     eliminated. Monitoring and maintenance is required
                                                requirements stated in the Standard are directed at ensuring       (particularly in the years after deployment). Refer to
                                                prescribed tidal works provide safety ladders or other design      the Safety in Design assessment for additional detail.
                                                features for the safety of a person who falls off the works into
                                                water;

                                                (d) if a relevant planning scheme standard is more stringent
                                                than the standard mentioned in paragraph (a), (b) or (c)—the
                                                relevant planning scheme standard, to the extent it is more
                                                stringent than the standard mentioned in paragraph (a), (b) or
                                                (c).


                                                                                                                                                                         14

Page 15

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 12.8 Appropriate measures are taken for          The design and construction of the prescribed tidal works is        Complies with Performance Outcome 12.8.
 prescribed tidal works for a non-private         consistent with the following standards—
 purpose to ensure an unsupportable live load     (a) subject to paragraph (b), prescribed tidal works have erected   The works are to be marked by a buoy with signage
 is not applied to the works by persons or        or placed in position on or near the works, a sign that—            indicating that the works are a restoration area.
 vehicles.                                        (i) is visible at all times; and                                    Details are available in section 7 of the Project
                                                                                                                      Restoration Plan.
                                                  (ii) states the maximum live load that may be applied to the
                                                  works, in terms of the maximum number of persons that may be
                                                  on the works at any given time or the maximum number of
                                                  vehicles of a particular type that may be on or moored at the
                                                  works at any given time;

                                                  (b) if a relevant planning scheme standard is more stringent
                                                  than the standard mentioned in paragraph (a)—the relevant
                                                  planning scheme standard, to the extent it is more stringent than
                                                  the standard mentioned in paragraph (a).

 12.9 Prescribed tidal works, other than a        The design and construction of the prescribed tidal works is        Not applicable.
 prescribed deck for a private purpose, are       consistent with each relevant planning scheme standard.
 designed and constructed in a way to ensure                                                                          Not in a canal.
 the use of tidal water in a canal for a non-
 maritime purpose is minimised.
                                                  (s 5(2) outcome)                                                    Not applicable.
 12.10 Prescribed tidal works that are a          The design and construction of the prescribed deck is consistent
 prescribed deck and for a private purpose, are   with the following standards—                                       Not a deck for a private purpose.
 designed and constructed in a way to ensure           (a) subject to paragraph (c), a prescribed deck does not
 the use of tidal water in a canal for a non-          extend more than 3m from the waterfront boundary of the lot
 maritime purpose is minimised.                        connected to the deck;

                                                      (b) subject to paragraph (c), a prescribed deck is at least
                                                      3m inside of the side boundary or extended side boundary
                                                      of the lot connected to the deck;

                                                      (c) if a relevant planning scheme standard is more stringent
                                                      than the standard mentioned in paragraph (a) or (b)—the
                                                      relevant planning scheme standard, to the extent it is more
                                                      stringent than the standard mentioned in paragraph (a) or
                                                      (b).


                                                                                                                                                                          15

Page 16

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                              Design, construction and safety - boat ramps and slip ways for private purpose
                                                   (s 5(2) outcome)
 13.1 Prescribed tidal works that are a boat       The design and construction of the boat ramp or slipway is         Not applicable.
 ramp or slipway for a private purpose are         consistent with the following standards—
 designed and constructed in a way to ensure            (a) subject to paragraph (c), the walls at the edge of the    Not a boat ramp or slipway.
 they are structurally sound while also ensuring        boat ramp or slipway penetrate into the earth at least
 the safe movement of vehicles or persons               600mm below the surface of the land on which the boat
 between the boat ramp or slipway and the               ramp or slipway is located;
 surface of the land on which the boat ramp or
 slipway is located.                                    (b) subject to paragraph (c), the surface of the boat ramp or
                                                        slipway is no more than 200mm above the surface of the
                                                        land on which it is located;

                                                      (c) if a relevant planning scheme standard is more stringent
                                                      than the standard mentioned in paragraph (a) or (b)—the
                                                      relevant planning scheme standard, to the extent it is more
                                                      stringent than the standard mentioned in paragraph (a) or
                                                      (b).

 13.2 Prescribed tidal works that are a boat      (s 5(2) outcome)
 ramp or slipway for a private purpose are        The design and construction of the boat ramp or slipway is         Not applicable.
 designed and constructed in a way to ensure      consistent with the following standards—
 the safe movement of vehicles or persons over         (a) subject to paragraph (d), the upper surface of a boat     Not a boat ramp or slipway. Not a private purpose.
 the boat ramp or slipway.                             ramp or slipway has a width of—

                                                          (i) for a boat ramp or slipway with vehicle access—no
                                                          less than 3.6m; or

                                                          (ii) for a boat ramp or slipway without vehicle access—
                                                          no less than 3.0m;

                                                      (b) subject to paragraph (d), the whole upper surface of a
                                                      boat ramp or slipway is treated to prevent it from becoming
                                                      slippery by using any of the following methods—

                                                          (i) forming grooves over the surface, as close as
                                                          possible to 40mm wide, 20mm deep and 150mm apart,


                                                                                                                                                                          16

Page 17

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           and at an angle as close as possible to 70° to the
                                                           centre-line of the boat ramp or slipway;

                                                           (ii) covering the surface with a substance ordinarily
                                                           used on slippery surfaces to prevent skidding;

                                                           (iii) making, through a physical act, the surface coarse
                                                           before it sets, including, for example, by raking the
                                                           surface;

                                                           (c) subject to paragraph (d), the upper surface of a boat
                                                           ramp or slipway for which a winch is not used to hoist or
                                                           haul vessels onto the boat ramp or slipway is at a
                                                           gradient of not steeper than—
                                                           (i) if the surface is treated by using a method
                                                           mentioned in paragraph (b)(i) or (ii)—1:7; or

                                                           (ii) otherwise—1:10;

                                                           (d) if a relevant planning scheme standard is more
                                                           stringent than the standard mentioned in paragraph (a),
                                                           (b) or (c)—the relevant planning scheme standard, to
                                                           the extent it is more stringent than the standard
                                                           mentioned in paragraph (a), (b) or (c).

                                                                  Design, construction and safety - bridges
                                                   The design and construction of the bridge is consistent with the     Not applicable
 14.1 Prescribed tidal works that are a bridge     following standards—
 do not adversely affect existing public use of         (a) subject to paragraph (b), the clearance levels under a      Not a bridge
 tidal water, including, for example, use of the        bridge are high enough to allow continued public use of tidal
 tidal water for canoeing, swimming or other            water over which it is constructed;
 recreational activities.
                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).




                                                                                                                                         17

Page 18

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 14.2 Prescribed tidal works that are a bridge     The design and construction of the bridge is consistent with the
 do not adversely affect the flow of tidal water   following standards—                                                Not applicable
 under the bridge.                                      (a) subject to paragraph (b)—
                                                                                                                       Not a bridge.
                                                           (i) if a bridge can be adequately supported without
                                                           erecting or placing a foundation support in tidal water—
                                                           no foundation support to support the bridge is erected or
                                                           placed in the tidal water; or

                                                           (ii) otherwise—only the minimum number of foundation
                                                           supports required to support the bridge is used;

                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).

                                                             Design, construction and safety - prescribed decks
                                                   (s 5(2) outcome)
 15.1 Prescribed tidal works that are a            The design and construction of the prescribed deck is consistent    Not applicable
 prescribed deck and for a private purpose are     with the following standards—
 designed and constructed in a way to ensure       (a) subject to paragraph (b), each of the following Australian      Not a deck
 the deck is able to support its intended loads,   Standards to the extent requirements stated in the Standard
 having regard to its relevant loading matters.    apply to relevant loading matters for the design or construction
                                                   of the prescribed deck—
                                                   (i) AS/NZS 1170.0;

                                                   (ii) AS/NZS 1170.1;

                                                   (iii) AS/NZS 1170.2;

                                                   (iv) AS 4997;

                                                   (b) if a relevant planning scheme standard is more stringent
                                                   than the standard mentioned in paragraph (a)—the relevant
                                                   planning scheme standard, to the extent it is more stringent than
                                                   the standard mentioned in paragraph (a).



                                                                                                                                        18

Page 19

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                   (s 5(2) outcome)
 15.2 Prescribed tidal works that are a            The design or construction of the prescribed deck is consistent     Not applicable.
 prescribed deck and for a non-private purpose     with the following standards—
 are designed and constructed in a way to          (a) subject to paragraph (b), each of the following Australian      Not a deck.
 ensure the deck is able to support its intended   Standards to the extent requirements stated in the Standard
 loads, having regard to its relevant loading      apply to relevant loading matters for the design or construction
 matters.                                          of a prescribed deck—
                                                   (i) AS/NZS 1170.0;

                                                   (ii) AS/NZS 1170.1;

                                                   (iii) AS/NZS 1170.2;

                                                   (iv) AS 1170.4;

                                                   (v) AS 4997;

                                                   (b) if a relevant planning scheme standard is more stringent
                                                   than the standard mentioned in paragraph (a)—the relevant
                                                   planning scheme standard, to the extent it is more stringent than
                                                   the standard mentioned in paragraph (a).

                                                   The design and construction of the prescribed deck is consistent
 15.3 Prescribed tidal works that are a            with the following standards—                                       Not applicable.
 prescribed deck do not prevent or hinder              (a) subject to paragraph (b), a prescribed deck either—
 remedial work being undertaken on any bank                                                                            Not a deck.
 of tidal water or for any existing revetment or           (i) can be easily dismantled and reassembled; or
 seawall or another existing structure.
                                                           (ii) does not restrict the movement of machinery
                                                           ordinarily used for remedial work to any bank of tidal
                                                           water or any existing revetment or seawall or other
                                                           existing structure;

                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).




                                                                                                                                         19

Page 20

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                               Design, construction and safety - jetties and piers
                                                   (s 5(2) outcome)
 16.1 Prescribed tidal works that are a jetty or   The design and construction of the jetty or pier is consistent with   Not applicable.
 pier are designed and constructed in a way to     the following standards—
 ensure the jetty or pier is able to support its   (a) subject to paragraph (b), each of the following Australian        Not a jetty or pier.
 intended loads, having regard to its relevant     Standards to the extent requirements stated in the Standard
 loading matters.                                  apply to relevant loading matters for the design or construction
                                                   of the jetty or pier—
                                                   (i) AS/NZS 1170.0;

                                                   (ii) AS/NZS 1170.1;

                                                   (iii) AS/NZS 1170.2;

                                                   (iv) AS 1170.4;

                                                   (v) AS 4997;

                                                   (b) if a relevant planning scheme standard is more stringent
                                                   than the standard mentioned in paragraph (a)—the relevant
                                                   planning scheme standard, to the extent it is more stringent than
                                                   the standard mentioned in paragraph (a).

                                                   The design and construction of the jetty or pier is consistent with
 16.2 Prescribed tidal works that are a jetty or   the following standards—                                              Not applicable.
 a pier are designed and constructed in a way           (a) subject to paragraph (b), either—
 to ensure the jetty or pier remains above the                                                                           Not a jetty or pier.
 water at highest astronomical tide.                       (i) the level of the deck of the jetty or pier is at least
                                                           300mm above the water at highest astronomical tide; or

                                                           (ii) piles or other markers indicate the presence of the
                                                           jetty or pier when the jetty or pier is less than 300mm
                                                           above the water at highest astronomical tide;

                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).



                                                                                                                                                20

Page 21

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 16.3 Prescribed tidal works that are a jetty or   (s 5(2) outcome)
 pier and for a private purpose and are on State   The design and construction of the jetty or pier is consistent with   Not applicable.
 tidal land are designed and constructed in a      the following standards—
 way to ensure the jetty or pier is of a size           (a) subject to paragraph (b)—                                    Not a jetty or pier.
 suitable for the use of a vessel while still
                                                           (i) all parts of the deck of the jetty or pier have a width
 minimising the amount of tidal water occupied
                                                           of at least 900mm and not more than 3m; and
 by the jetty or pier.
                                                           (ii) all parts of the jetty or pier are within a water
                                                           allocation area for the lot connected to the jetty or pier;

                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).

                                               Design, construction and safety - Pipelines and other underground services
                                                  (s 5(2) outcome)
 17.1 The design and construction of              The design and construction of the pipeline or underground    Not applicable.
 prescribed tidal works that are a pipeline or    service is consistent with the following standards—
 another underground service ensures vessels           (a) subject to paragraph (b)—                            Not underground services.
 anchoring near the works can not interfere
 with, or damage, the works.                               (i) for a pipeline that is gas or liquid petroleum
                                                           pipeline—AS/NZS 2885 to the extent requirements
                                                           stated in the Standard apply to the design or
                                                           construction of the pipeline; or

                                                           (ii) for another pipeline or other underground service—
                                                           the pipeline or service is installed at least 1.2m below
                                                           the surface of land, after it is installed;

                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).




                                                                                                                                                21

Page 22

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                 Design, construction and safety - pontoons
                                                  (s 5(2) outcome)
 18.1 Prescribed tidal works that are a pontoon   The design and construction of the pontoon is consistent with         Not applicable.
 and not used only for rowing, are designed       the following standards—
 and constructed in a way to ensure the                (a) subject to paragraph (b), each of the following Australian   Not a pontoon.
 pontoon is able to support its intended loads,        Standards to the extent requirements stated in the Standard
 having regard to its relevant loading matters.        apply to relevant loading matters for the design or
                                                       construction of the pontoon—

                                                          (i) AS/NZS 1170.0;

                                                          (ii) AS/NZS 1170.1;

                                                          (iii) AS/NZS 1170.2;

                                                          (iv) AS 1170.4;

                                                          (v) AS 3962;

                                                          (vi) AS 4997;

                                                      (b) if a relevant planning scheme standard is more stringent
                                                      than the standard mentioned in paragraph (a)—the relevant
                                                      planning scheme standard, to the extent it is more stringent
                                                      than the standard mentioned in paragraph (a).

 18.2 Prescribed tidal works that are a pontoon   (s 5(2) outcome)
 and used only for rowing are designed and        The design and construction of the pontoon is consistent with         Not applicable.
 constructed in a way to ensure—                  the following standards—
                                                       (a) subject to paragraph (b)—                                    Not a pontoon.
     (a) the pontoon is able to support its
     intended loads, having regard to its                 (i) for a pontoon constructed within a marina—AS 3962
     relevant loading matters; and                        to the extent requirements stated in the Standard apply
                                                          to relevant loading matters for the design or
     (b) the pontoon is safe for persons using            construction of the pontoon; or
     the pontoon to launch and retrieve rowing
     vessels.                                             (ii) for a pontoon not constructed within a marina—


                                                                                                                                          22

Page 23

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                              (A) the access walkway of a pontoon used only for
                                                              rowing is able to support at least a live load of
                                                              3.0kPa; and

                                                              (B) the flotation unit of a pontoon used only for
                                                              rowing is able to support at least a live load of
                                                              1.5kPa; and

                                                               (C) at least 75mm of the height of the pontoon’s
                                                              flotation unit will remain above the surface of the
                                                              water over which it is constructed if a distributed live
                                                              load is applied to half of the surface of the
                                                              pontoon’s flotation unit and all of the surface of the
                                                              pontoon’s access walkway;
                                                              (b) if a relevant planning scheme standard is more
                                                              stringent than the standard mentioned in paragraph
                                                              (a)—the relevant planning scheme standard, to the
                                                              extent it is more stringent than the standard
                                                              mentioned in paragraph (a).

                                                  (s 5(2) outcome)
 18.3 Prescribed tidal works that are a pontoon   The design and construction of the pontoon is consistent with          Not applicable.
 are designed and constructed in a way to         the following standards—
 ensure any load applied to the pontoon by a           (a) subject to paragraph (b)—                                     Not a pontoon.
 person or thing on the pontoon does not cause
 the pontoon to tip over or tilt to a degree              (i) for a pontoon constructed within a marina—AS 3962
 causing the person or thing to fall off the              to the extent requirements stated in the Standard apply
 pontoon.                                                 to relevant loading matters for the design or
                                                          construction of the pontoon; or

                                                          (ii) for a pontoon not constructed within a marina—

                                                              (A) the pontoon’s access walkway extends at
                                                              least 500mm onto the pontoon’s flotation unit; and

                                                              (B) for a pontoon used only for rowing—at least
                                                              75mm of the height of the pontoon’s flotation unit
                                                              remains above the water over which it is
                                                              constructed if a distributed live load is applied to

                                                                                                                                           23

Page 24

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                 half of the surface of the pontoon’s flotation unit and
                                                                 all of the surface of the pontoon’s access walkways;
                                                                 and

                                                                 (C) for a pontoon other than a pontoon mentioned
                                                                 in sub-subparagraph (B)—the top surface of the
                                                                 pontoon’s flotation unit remains above the water
                                                                 over which it is constructed if a distributed live load
                                                                 of 1.5kPa is applied to half of the surface of the
                                                                 pontoon’s flotation unit and all of the surface of the
                                                                 pontoon’s access walkways; and

                                                                 (D) the whole base of the pontoon’s flotation unit
                                                                 remains in contact with the water over which it is
                                                                 constructed at all times and tilts no more than 15º at
                                                                 any time;

                                                                 (b) if a relevant planning scheme standard is more
                                                                 stringent than the standard mentioned in paragraph
                                                                 (a)—the relevant planning scheme standard, to the
                                                                 extent it is more stringent than the standard
                                                                 mentioned in paragraph (a).

 18.4 Prescribed tidal works that are a             The design and construction of the pontoon is consistent with
 pontoon are designed and constructed in a          the following standards—                                               Not applicable.
 way to ensure the pontoon’s flotation unit              (a) subject to paragraph (c), the pontoon’s flotation unit is—
 will—                                                                                                                     Not a pontoon.
                                                            (i) attached, through the pontoon’s system for mooring
 (a) rise and fall to allow for a change in tidal           the unit, to concrete anchors in the bank landward of the
 water levels, including a change caused by a               pontoon; or
 flood or storm tide; and
                                                            (ii) moored by piles;
 (b) not be separated from the lot to which the
                                                        (b) subject to paragraph (c), if a tidal water level change
 pontoon is connected because of—
                                                        resulting from a flood or storm tide with an AEP of 1% would
 (i) a change in tidal water levels mentioned in        cause a pontoon’s flotation unit to detach from the system
 paragraph (a); or                                      for mooring the unit—

                                                            (i) the standard applying under paragraph (a); and


                                                                                                                                             24

Page 25

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 (ii) the flow of tidal water around the pontoon,           (ii) the pontoon’s flotation unit is restrained with a
 including tidal water affected by a flood or               tethering system so that it can withstand the effects of
 storm tide.                                                the event;

                                                        (c) if a relevant planning scheme standard is more stringent
                                                        than the standard mentioned in paragraph (a) or (b)—the
                                                        relevant planning scheme standard, to the extent it is more
                                                        stringent than the standard mentioned in paragraph (a) or
                                                        (b).

 18.5 Prescribed tidal works that are a pontoon     The design and construction of the pontoon is consistent with
 identifies the lot to which the pontoon is         the following standards—                                            Not applicable.
 connected.                                              (a) a label that identifies the lot to which the pontoon is
                                                         connected is written or stamped on, or fixed to, the outside   Not a pontoon.
                                                         of the pontoon’s flotation unit;

                                                        (b) if a relevant planning scheme standard is more stringent
                                                        than the standard mentioned in paragraph (a)—the relevant
                                                        planning scheme standard, to the extent it is more stringent
                                                        than the standard mentioned in paragraph (a).




                                                                                                                                          25

Page 26

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 18.6 Prescribed tidal works that are a pontoon      (s 5(2) outcome)
 permanently used for the fuelling of, or the        The design and construction of the pontoon is consistent with         Not applicable.
 storage of fuel for, vessels are designed and       the following standards—
 constructed in a way to ensure—                          (a) subject to paragraph (c), each of the following Australian   Not a pontoon.
                                                          Standards to the extent requirements stated in the Standard
     (a) the pontoon is able to support its               apply to relevant loading matters for the design or
     intended loads, having regard to its                 construction of the pontoon—
     relevant loading matters; and
                                                             (i) AS/NZS 1170.0;
     (b) the pontoon is safe for persons using
     the pontoon.                                            (ii) AS/NZS 1170.1;

                                                             (iii) AS/NZS 1170.2;

                                                             (iv) AS 1170.4;

                                                             (v) AS 4997;

                                                         (b) subject to paragraph (c), AS 3962 to the extent
                                                         requirements stated in the Standard apply to a pontoon
                                                         permanently used for the fuelling of, or the storage of fuel;

                                                         (c) if a relevant planning scheme standard is more stringent
                                                         than the standard mentioned in paragraph (a) or (b)—the
                                                         relevant planning scheme standard, to the extent it is more
                                                         stringent than the standard mentioned in paragraph (a) or
                                                         (b).

                                                           Design, construction and safety – revetments and seawalls
                                                     (s 5(2) outcome)
 19.1 Prescribed tidal works that are a              The design and construction of the revetment or seawall is          Not applicable.
 revetment or seawall, are designed and              consistent with the following standards—
 constructed in a way to ensure the revetment             (a) subject to paragraph (c), each of the following Australian Not a revetment or seawall.
 or seawall is able to support its intended loads,        Standards to the extent requirements stated in the Standard
 having regard to its relevant loading matters            apply to relevant loading matters for the design or            Despite this, it is noted that the rock size for the reef
 and its intended design life.                            construction of the revetment or seawall—                      substrate has been selected to be stable for the
                                                                                                                         intended loads including wave and current conditions
                                                                                                                         anticipated at the site for a 50 year ARI event.

                                                                                                                                                                                     26

Page 27

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           (i) AS/NZS 1170.0;

                                                           (ii) AS/NZS 1170.1;

                                                           (iii) AS/NZS 1170.2;

                                                           (iv) AS 1170.4;

                                                           (v) AS 4997;

                                                       (b) subject to paragraph (c), AS 4678 to the extent
                                                       requirements stated in the Standard apply to earth-retaining
                                                       structures;

                                                       (c) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a) or (b)—the
                                                       relevant planning scheme standard, to the extent it is more
                                                       stringent than the standard mentioned in paragraph (a) or
                                                       (b).

 19.2 Prescribed tidal works that are a            (s 5(2) outcome)
 revetment or seawall, are designed and            The design and construction of the revetment or seawall is           Not applicable.
 constructed in a way to ensure the revetment      consistent with the following standards—
 or seawall can withstand—                              (a) subject to paragraph (d), a revetment or seawall is able    Not a revetment or seawall.
                                                        to withstand the effect of waves, or a combination of waves
     (a) any tendency of overturning or sliding;        and water levels, resulting from a storm event with an AEP      Despite this, it is noted that
     and                                                of 2%, factoring in projected sea level rise;                      a) as a flexible rock structure, failure modes do
                                                                                                                                 not include overturning or turning
     (b) any other effects of waves or changes         (b) subject to paragraph (d), each of the following Australian      b) the structure has been designed in a way that
     in water levels on the revetment or               Standards to the extent requirements stated in the Standard               it can withstand the effects of waves and
     seawall.                                                                                                                    water levels.
                                                       apply to relevant loading matters for the design or
                                                       construction of the revetment or seawall—

                                                           (i) AS/NZS 1170.0;

                                                           (ii) AS/NZS 1170.1;



                                                                                                                                                                           27

Page 28

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           (iii) AS/NZS 1170.2;

                                                           (iv) AS 1170.4;

                                                           (v) AS 4997;

                                                           (c) subject to paragraph (d), AS 4678 to the extent
                                                           requirements stated in the Standard apply to earth-
                                                           retaining structures;

                                                           (d) if a relevant planning scheme standard is more
                                                           stringent than the standard mentioned in paragraph (a),
                                                           (b) or (c)—the relevant planning scheme standard, to
                                                           the extent it is more stringent than the standard
                                                           mentioned in paragraph (a), (b) or (c).

                                                   (s 5(2) outcome)
 19.3 Prescribed tidal works that are a            The design and construction of the revetment or seawall is           Not applicable.
 revetment or seawall are designed and             consistent with the following standards—
 constructed to protect the revetment or seawall        (a) subject to paragraph (d), a revetment or seawall            Not a revetment or seawall.
 from erosion at the base of the revetment or           provides for a sub-layer or enough filter material to prevent
 seawall.                                               erosion of the land under the revetment or seawall;             Despite this, it is noted that the rock structure is
                                                                                                                        expected to experience some slumping over time with
                                                       (b) subject to paragraph (d), the bottom edge of the base of     subsequent top-up in response to monitoring. This is
                                                       a revetment or seawall will withstand undermining by scour;      to avoid the use of geotextiles or scour aprons which
                                                                                                                        would restrict access between individual reef patches
                                                       (c) subject to paragraph (d), AS 2758 to the extent              for the purposes of monitoring. Refer ICM Drawing
                                                       requirements stated in the Standard apply to the sizing and      NROR-2021-00 Note 4.
                                                       grading of filter layers and armour materials;

                                                       (d) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a), (b) or (c)—
                                                       the relevant planning scheme standard, to the extent it is
                                                       more stringent than the standard mentioned in paragraph
                                                       (a), (b) or (c).




                                                                                                                                                                            28

Page 29

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 19.4 Prescribed tidal works that are a             The design and construction of the revetment or seawall is
 revetment or seawall are not adversely             consistent with the following standards—                           Not applicable.
 affected by hydrostatic pressure.                      (a) subject to paragraph (b), AS 4678 to the extent
                                                        requirements stated in the Standard apply to hydrostatic       Not a revetment or seawall.
                                                        pressure for earth-retaining structures;

                                                        (b) if a relevant planning scheme standard is more stringent
                                                        than the standard mentioned in paragraph (a)—the relevant
                                                        planning scheme standard, to the extent it is more stringent
                                                        than the standard mentioned in paragraph (a).

                                                                  Design, construction and safety -wharves
                                                    (s 5(2) outcome)
 20.1 Prescribed tidal works that are a wharf       The design and construction of the wharf is consistent with the    Not applicable.
 are designed and constructed in a way to           following standards—
 ensure it is able to support its intended loads,        (a) subject to paragraph (b)—                                 Not a wharf.
 having regard to its relevant loading matters.
                                                            (i) for a wharf constructed within a marina—AS 3962 to
                                                            the extent requirements stated in the Standard apply to
                                                            relevant loading matters for the design or construction
                                                            of the wharf; or

                                                            (ii) for a wharf not constructed within a marina—each of
                                                            the following Australian Standards to the extent
                                                            requirements stated in the Standard apply to relevant
                                                            loading matters for the design or construction of the
                                                            wharf—
                                                            (A) AS/NZS 1170.0;
                                                            (B) AS/NZS 1170.1;
                                                            (C) AS/NZS 1170.2;
                                                            (D) AS 1170.4;
                                                            (E) AS 4997;
                                                            (b) if a relevant planning scheme standard is more
                                                            stringent than the standard mentioned in paragraph
                                                            (a)—the relevant planning scheme standard, to the
                                                            extent it is more stringent than the standard mentioned
                                                            in paragraph (a).


                                                                                                                                                     29

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.