Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                Character and amenity (generally)—prescribed tidal work not in a canal
 2.1 Prescribed tidal works not in a canal are   The design and construction of the prescribed tidal works is       Complies with Performance Outcome 2.1. Due to the
 compatible with their location, having regard toconsistent with the following standards—                           nature of the project the nominated Acceptable
 the following—                                  (a) subject to paragraph (d), prescribed tidal works do not        Outcomes are not considered to be suitable but have
 (a) the character and amenity of the works’     extend past the side boundary or extended side boundary of the     been considered.
 immediate surroundings and the locality within  lot connected to the works;
 which the works are located;                                                                                       The works are to restore rock oyster ecosystems
                                                 (b) subject to paragraph (d), prescribed tidal works are the only  throughout the Noosa River estuary that meet site
 (b) if the relevant planning scheme states the  works of their type along the edge of the tidal water fronting the suitability criteria and positively interact with current
 desired character or amenity for the works’     lot connected to the works;                                        human uses. As the Noosa River was historically
 immediate surroundings or the locality within                                                                      characterised by significant oyster ecosystems, they
 which the works are located—the stated          (c) subject to paragraph (d)—
                                                                                                                    are considered to be consistent with the character and
 desired character or amenity.                   (i) for prescribed tidal works for a private purpose—the works
                                                                                                                    amenity of the works’ immediate surroundings and the
                                                 are not roofed; or
                                                                                                                    locality in which the works are located. Restoration
                                                 (ii) for prescribed tidal works for a non-private purpose—the      Zones have been developed based on Habitat
                                                 works are not roofed unless they are the main access to land;      Suitability parameters and Restoration Suitability
                                                                                                                    parameters as detailed in the Project Restoration Plan.
                                                 (d) if a relevant planning scheme standard is more stringent
                                                 than the standard mentioned in paragraph (a), (b) or (c)—the       (a) The Restoration Zones include large areas of the
                                                 relevant planning scheme standard, to the extent it is more        Noosa River and as such are adjacent to multiple Lots.
                                                 stringent than the standard mentioned in paragraph (a), (b) or
                                                 (c);                                                               (b) The Works are expected to be implemented
                                                                                                                    progressively with Phase 1 currently planned and
                                                 (e) any other relevant planning scheme standard that is not        Phase 2 to occur over time as funds become available.
                                                 inconsistent with the standards mentioned in paragraphs (a) to     As such, Phase 2 could include extension of Phase 1
                                                 (d).                                                               reef habitat which could include placement of
                                                                                                                    additional works of their type adjust to the frontage of
                                                                                                                    the same lots as Phase 1.

                                                                                                                      (c) The works are not roofed.




                                                                                                                                                                                2
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.