Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
Specific outcome A probable solution Comment
Character and amenity (generally)—prescribed tidal work in a canal
1.1 Prescribed tidal works in a canal are The design and construction of the prescribed tidal works is
compatible with their location, having regard to consistent with the following standards— Not applicable.
the following— (a) subject to paragraph (c), prescribed tidal works do not
extend past the side boundary or extended side boundary of the Not in a canal.
(a) the character and amenity of the works’ lot connected to the works;
immediate surroundings and the locality within
which the works are located; (b) subject to paragraph (c)—
(i) for prescribed tidal works for a private purpose—the works
(b) if the relevant planning scheme states the are not roofed; or
desired character or amenity for the works’
immediate surroundings or the locality within (ii) for prescribed tidal works for a non-private purpose—the
which the works are located—the stated works are not roofed unless they are the main access to land;
desired character or amenity.
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to
(c).