Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           and at an angle as close as possible to 70° to the
                                                           centre-line of the boat ramp or slipway;

                                                           (ii) covering the surface with a substance ordinarily
                                                           used on slippery surfaces to prevent skidding;

                                                           (iii) making, through a physical act, the surface coarse
                                                           before it sets, including, for example, by raking the
                                                           surface;

                                                           (c) subject to paragraph (d), the upper surface of a boat
                                                           ramp or slipway for which a winch is not used to hoist or
                                                           haul vessels onto the boat ramp or slipway is at a
                                                           gradient of not steeper than—
                                                           (i) if the surface is treated by using a method
                                                           mentioned in paragraph (b)(i) or (ii)—1:7; or

                                                           (ii) otherwise—1:10;

                                                           (d) if a relevant planning scheme standard is more
                                                           stringent than the standard mentioned in paragraph (a),
                                                           (b) or (c)—the relevant planning scheme standard, to
                                                           the extent it is more stringent than the standard
                                                           mentioned in paragraph (a), (b) or (c).

                                                                  Design, construction and safety - bridges
                                                   The design and construction of the bridge is consistent with the     Not applicable
 14.1 Prescribed tidal works that are a bridge     following standards—
 do not adversely affect existing public use of         (a) subject to paragraph (b), the clearance levels under a      Not a bridge
 tidal water, including, for example, use of the        bridge are high enough to allow continued public use of tidal
 tidal water for canoeing, swimming or other            water over which it is constructed;
 recreational activities.
                                                       (b) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a)—the relevant
                                                       planning scheme standard, to the extent it is more stringent
                                                       than the standard mentioned in paragraph (a).




                                                                                                                                         17
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.