Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
16.3 Prescribed tidal works that are a jetty or (s 5(2) outcome)
pier and for a private purpose and are on State The design and construction of the jetty or pier is consistent with Not applicable.
tidal land are designed and constructed in a the following standards—
way to ensure the jetty or pier is of a size (a) subject to paragraph (b)— Not a jetty or pier.
suitable for the use of a vessel while still
(i) all parts of the deck of the jetty or pier have a width
minimising the amount of tidal water occupied
of at least 900mm and not more than 3m; and
by the jetty or pier.
(ii) all parts of the jetty or pier are within a water
allocation area for the lot connected to the jetty or pier;
(b) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a)—the relevant
planning scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a).
Design, construction and safety - Pipelines and other underground services
(s 5(2) outcome)
17.1 The design and construction of The design and construction of the pipeline or underground Not applicable.
prescribed tidal works that are a pipeline or service is consistent with the following standards—
another underground service ensures vessels (a) subject to paragraph (b)— Not underground services.
anchoring near the works can not interfere
with, or damage, the works. (i) for a pipeline that is gas or liquid petroleum
pipeline—AS/NZS 2885 to the extent requirements
stated in the Standard apply to the design or
construction of the pipeline; or
(ii) for another pipeline or other underground service—
the pipeline or service is installed at least 1.2m below
the surface of land, after it is installed;
(b) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a)—the relevant
planning scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a).
21