Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                 Design, construction and safety - pontoons
                                                  (s 5(2) outcome)
 18.1 Prescribed tidal works that are a pontoon   The design and construction of the pontoon is consistent with         Not applicable.
 and not used only for rowing, are designed       the following standards—
 and constructed in a way to ensure the                (a) subject to paragraph (b), each of the following Australian   Not a pontoon.
 pontoon is able to support its intended loads,        Standards to the extent requirements stated in the Standard
 having regard to its relevant loading matters.        apply to relevant loading matters for the design or
                                                       construction of the pontoon—

                                                          (i) AS/NZS 1170.0;

                                                          (ii) AS/NZS 1170.1;

                                                          (iii) AS/NZS 1170.2;

                                                          (iv) AS 1170.4;

                                                          (v) AS 3962;

                                                          (vi) AS 4997;

                                                      (b) if a relevant planning scheme standard is more stringent
                                                      than the standard mentioned in paragraph (a)—the relevant
                                                      planning scheme standard, to the extent it is more stringent
                                                      than the standard mentioned in paragraph (a).

 18.2 Prescribed tidal works that are a pontoon   (s 5(2) outcome)
 and used only for rowing are designed and        The design and construction of the pontoon is consistent with         Not applicable.
 constructed in a way to ensure—                  the following standards—
                                                       (a) subject to paragraph (b)—                                    Not a pontoon.
     (a) the pontoon is able to support its
     intended loads, having regard to its                 (i) for a pontoon constructed within a marina—AS 3962
     relevant loading matters; and                        to the extent requirements stated in the Standard apply
                                                          to relevant loading matters for the design or
     (b) the pontoon is safe for persons using            construction of the pontoon; or
     the pontoon to launch and retrieve rowing
     vessels.                                             (ii) for a pontoon not constructed within a marina—


                                                                                                                                          22
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.