Original source · versioned page text
Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
(ii) the flow of tidal water around the pontoon, (ii) the pontoon’s flotation unit is restrained with a
including tidal water affected by a flood or tethering system so that it can withstand the effects of
storm tide. the event;
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a) or
(b).
18.5 Prescribed tidal works that are a pontoon The design and construction of the pontoon is consistent with
identifies the lot to which the pontoon is the following standards— Not applicable.
connected. (a) a label that identifies the lot to which the pontoon is
connected is written or stamped on, or fixed to, the outside Not a pontoon.
of the pontoon’s flotation unit;
(b) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a)—the relevant
planning scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a).
25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.