Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
18.6 Prescribed tidal works that are a pontoon (s 5(2) outcome)
permanently used for the fuelling of, or the The design and construction of the pontoon is consistent with Not applicable.
storage of fuel for, vessels are designed and the following standards—
constructed in a way to ensure— (a) subject to paragraph (c), each of the following Australian Not a pontoon.
Standards to the extent requirements stated in the Standard
(a) the pontoon is able to support its apply to relevant loading matters for the design or
intended loads, having regard to its construction of the pontoon—
relevant loading matters; and
(i) AS/NZS 1170.0;
(b) the pontoon is safe for persons using
the pontoon. (ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 1170.4;
(v) AS 4997;
(b) subject to paragraph (c), AS 3962 to the extent
requirements stated in the Standard apply to a pontoon
permanently used for the fuelling of, or the storage of fuel;
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a) or
(b).
Design, construction and safety – revetments and seawalls
(s 5(2) outcome)
19.1 Prescribed tidal works that are a The design and construction of the revetment or seawall is Not applicable.
revetment or seawall, are designed and consistent with the following standards—
constructed in a way to ensure the revetment (a) subject to paragraph (c), each of the following Australian Not a revetment or seawall.
or seawall is able to support its intended loads, Standards to the extent requirements stated in the Standard
having regard to its relevant loading matters apply to relevant loading matters for the design or Despite this, it is noted that the rock size for the reef
and its intended design life. construction of the revetment or seawall— substrate has been selected to be stable for the
intended loads including wave and current conditions
anticipated at the site for a 50 year ARI event.
26