Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           (iii) AS/NZS 1170.2;

                                                           (iv) AS 1170.4;

                                                           (v) AS 4997;

                                                           (c) subject to paragraph (d), AS 4678 to the extent
                                                           requirements stated in the Standard apply to earth-
                                                           retaining structures;

                                                           (d) if a relevant planning scheme standard is more
                                                           stringent than the standard mentioned in paragraph (a),
                                                           (b) or (c)—the relevant planning scheme standard, to
                                                           the extent it is more stringent than the standard
                                                           mentioned in paragraph (a), (b) or (c).

                                                   (s 5(2) outcome)
 19.3 Prescribed tidal works that are a            The design and construction of the revetment or seawall is           Not applicable.
 revetment or seawall are designed and             consistent with the following standards—
 constructed to protect the revetment or seawall        (a) subject to paragraph (d), a revetment or seawall            Not a revetment or seawall.
 from erosion at the base of the revetment or           provides for a sub-layer or enough filter material to prevent
 seawall.                                               erosion of the land under the revetment or seawall;             Despite this, it is noted that the rock structure is
                                                                                                                        expected to experience some slumping over time with
                                                       (b) subject to paragraph (d), the bottom edge of the base of     subsequent top-up in response to monitoring. This is
                                                       a revetment or seawall will withstand undermining by scour;      to avoid the use of geotextiles or scour aprons which
                                                                                                                        would restrict access between individual reef patches
                                                       (c) subject to paragraph (d), AS 2758 to the extent              for the purposes of monitoring. Refer ICM Drawing
                                                       requirements stated in the Standard apply to the sizing and      NROR-2021-00 Note 4.
                                                       grading of filter layers and armour materials;

                                                       (d) if a relevant planning scheme standard is more stringent
                                                       than the standard mentioned in paragraph (a), (b) or (c)—
                                                       the relevant planning scheme standard, to the extent it is
                                                       more stringent than the standard mentioned in paragraph
                                                       (a), (b) or (c).




                                                                                                                                                                            28
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.