Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 19.4 Prescribed tidal works that are a             The design and construction of the revetment or seawall is
 revetment or seawall are not adversely             consistent with the following standards—                           Not applicable.
 affected by hydrostatic pressure.                      (a) subject to paragraph (b), AS 4678 to the extent
                                                        requirements stated in the Standard apply to hydrostatic       Not a revetment or seawall.
                                                        pressure for earth-retaining structures;

                                                        (b) if a relevant planning scheme standard is more stringent
                                                        than the standard mentioned in paragraph (a)—the relevant
                                                        planning scheme standard, to the extent it is more stringent
                                                        than the standard mentioned in paragraph (a).

                                                                  Design, construction and safety -wharves
                                                    (s 5(2) outcome)
 20.1 Prescribed tidal works that are a wharf       The design and construction of the wharf is consistent with the    Not applicable.
 are designed and constructed in a way to           following standards—
 ensure it is able to support its intended loads,        (a) subject to paragraph (b)—                                 Not a wharf.
 having regard to its relevant loading matters.
                                                            (i) for a wharf constructed within a marina—AS 3962 to
                                                            the extent requirements stated in the Standard apply to
                                                            relevant loading matters for the design or construction
                                                            of the wharf; or

                                                            (ii) for a wharf not constructed within a marina—each of
                                                            the following Australian Standards to the extent
                                                            requirements stated in the Standard apply to relevant
                                                            loading matters for the design or construction of the
                                                            wharf—
                                                            (A) AS/NZS 1170.0;
                                                            (B) AS/NZS 1170.1;
                                                            (C) AS/NZS 1170.2;
                                                            (D) AS 1170.4;
                                                            (E) AS 4997;
                                                            (b) if a relevant planning scheme standard is more
                                                            stringent than the standard mentioned in paragraph
                                                            (a)—the relevant planning scheme standard, to the
                                                            extent it is more stringent than the standard mentioned
                                                            in paragraph (a).


                                                                                                                                                     29
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.