Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                Character and amenity (materials and colours)
 4.1 The materials used for, and the colours         The materials used for, and colours of, the prescribed tidal works     Complies with Performance Outcome 4.1
 of, prescribed tidal works are compatible with      are consistent with each relevant planning scheme standard.
 the character and amenity of the works’                                                                                    The works include the placement of locally sourced
 location, having regard to the following—                                                                                  rock and oyster shell as detailed in ICM drawing
 (a) the natural features of the works’                                                                                     SROR-2021-02.
 immediate surroundings and the locality within
 which the works are located;                                                                                                   a)   The materials are consistent with natural
                                                                                                                                     rocky rubble reefs which are present within
 (b) the existing buildings or other structures in                                                                                   some area of the Restoration Zones.
 the works’ immediate surroundings and the
 locality within which the works are located;                                                                                   b)   The materials are consistent with rock
                                                                                                                                     erosion protection structures located
 (c) if the relevant planning scheme states the
                                                                                                                                     throughout the Noosa River.
 desired materials to be used for, or desired
 colours of, buildings or other structures in the
 works’ immediate surroundings or the locality
 within which the works are located—the stated
 desired materials or colours.

                                                                                       Lighting
 5.1 Lighting, other than an aid to navigation,      The lighting for the prescribed tidal works, other than an aid to      Complies with Performance Outcome 5.1
 for prescribed tidal works is installed in a way    navigation, is consistent with the following standards—
 to ensure the security and safe use of the          (a) subject to paragraph (c), lighting for prescribed tidal works is   The works are oyster habitat and will not be lit.
 works without causing significant adverse           hooded and directed downwards;
 effects on the amenity of the locality within
 which the works are located.                        (b) subject to paragraph (c), each lighting standard, to the
                                                     extent relevant;

                                                     (c) if a relevant planning scheme standard is more stringent
                                                     than the standard mentioned in paragraph (a) or (b)—the
                                                     relevant planning scheme standard, to the extent the standard is
                                                     more stringent than the standard mentioned in paragraph (a) or
                                                     (b);

                                                     (d) any other relevant planning scheme standard that is not
                                                     inconsistent with the standards mentioned in paragraphs (a), (b)
                                                     and (c).



                                                                                                                                                                                   4
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.