Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
Character and amenity (materials and colours)
4.1 The materials used for, and the colours The materials used for, and colours of, the prescribed tidal works Complies with Performance Outcome 4.1
of, prescribed tidal works are compatible with are consistent with each relevant planning scheme standard.
the character and amenity of the works’ The works include the placement of locally sourced
location, having regard to the following— rock and oyster shell as detailed in ICM drawing
(a) the natural features of the works’ SROR-2021-02.
immediate surroundings and the locality within
which the works are located; a) The materials are consistent with natural
rocky rubble reefs which are present within
(b) the existing buildings or other structures in some area of the Restoration Zones.
the works’ immediate surroundings and the
locality within which the works are located; b) The materials are consistent with rock
erosion protection structures located
(c) if the relevant planning scheme states the
throughout the Noosa River.
desired materials to be used for, or desired
colours of, buildings or other structures in the
works’ immediate surroundings or the locality
within which the works are located—the stated
desired materials or colours.
Lighting
5.1 Lighting, other than an aid to navigation, The lighting for the prescribed tidal works, other than an aid to Complies with Performance Outcome 5.1
for prescribed tidal works is installed in a way navigation, is consistent with the following standards—
to ensure the security and safe use of the (a) subject to paragraph (c), lighting for prescribed tidal works is The works are oyster habitat and will not be lit.
works without causing significant adverse hooded and directed downwards;
effects on the amenity of the locality within
which the works are located. (b) subject to paragraph (c), each lighting standard, to the
extent relevant;
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent the standard is
more stringent than the standard mentioned in paragraph (a) or
(b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a), (b)
and (c).
4