Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                                                       Signage
 6.1 A sign erected or otherwise placed in           A sign erected or otherwise placed in position for prescribed tidal    Complies with Performance Outcome 6.1
 position for prescribed tidal works, other than     works, other than a sign erected or placed for safety reasons or
 a sign erected or placed for safety reasons or      under an Act, is consistent with the following standards—              Signage and aids to navigation are to be installed as
 under an Act—                                       (a) subject to paragraph (c), a sign erected or placed in position     required by MSQ permit conditions. Section 7 of the
 (a) is compatible with the character and            for identifying prescribed tidal works, or the owner of the works,     Project Restoration Plan outlines navigation aid type,
 amenity of the works’ immediate surroundings        is the only sign erected or placed in position for identifying the     signage specifications and signage certification. This
 and the locality within which the works are         works or owner;                                                        selection has been informed by pre-lodgement
 located; and                                                                                                               discussions with MSQ.
                                                     (b) subject to paragraph (c), a sign erected or otherwise placed
 (b) is not a dominant feature of the works,         in position for prescribed tidal works is integrated into the design       a)   The aids to navigation are to be of a type
 unless the dominance is for safety reasons.         and construction of the works;                                                  consistent with standard MSQ buoys and are
                                                                                                                                     therefore compatible with the character and
                                                     (c) if a relevant planning scheme standard is more stringent
                                                                                                                                     amenity of the works’ locality. SCG has
                                                     than the standard mentioned in paragraph (a) or (b)—the
                                                                                                                                     certified that the signage is consistent with
                                                     relevant planning scheme standard, to the extent it is more
                                                                                                                                     the requirements of the Coastal Protection
                                                     stringent than the standard mentioned in paragraph (a) or (b);
                                                                                                                                     and Management Act.
                                                     (d) any other relevant planning scheme standard that is not
                                                     inconsistent with the standards mentioned in paragraphs (a), (b)           b)   The dominance of the signage will be based
                                                     and (c).                                                                        on navigational safety requirements.

                                                                      Earthwork, vegetation & rehabilitation
 7.1 Excavation and filling for prescribed tidal     The earthwork and filling for the prescribed tidal works is            Not applicable.
 works—                                              consistent with each relevant planning scheme standard.
 (a) is carried out only to the extent reasonably                                                                           The works do not include removal of any material,
 necessary for the works; and                                                                                               excavation or filling.

 (b) does not have a significant adverse effect
 on—
 (i) the natural features, including the banks, of
 the tidal water in the works’ immediate
 surroundings; or

 (ii) the level of the surface of the land under
 the tidal water in the works’ immediate
 surroundings or any foreshore near the works.




                                                                                                                                                                                     5
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.