Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

                                                           Navigable access to, or egress from, non-tidal work lots
 10.1 Prescribed tidal works that are for a        The design and construction of the prescribed tidal works is     Not applicable.
 private purpose do not adversely affect           consistent with the following standards—
 navigable access to, or navigable egress from,    (a) subject to paragraph (b), prescribed tidal works—            The works are not for a private purpose.
 any lot that adjoins, or is in the immediate      (i) for a lot connected to the works for which there is a water
 surroundings of, a lot connected to prescribed    allocation area —are not constructed outside the water
 tidal works.                                      allocation area; and

                                                   (ii) for a lot connected to works for which there is no water
                                                   allocation area —are no closer than 1.5m to that lot’s side
                                                   boundary or extended side boundary;

                                                   (b) if a relevant planning scheme standard is more stringent
                                                   than the standard mentioned in paragraph (a)—the relevant
                                                   planning scheme standard, to the extent it is more stringent than
                                                   the standard mentioned in paragraph (a).

                                                  Infrastructure, including access, parking, sewerage and water services
 11.1 Prescribed tidal works have appropriate       The infrastructure for prescribed tidal works is consistent with Complies with Performance Outcome 11.1
 infrastructure, including, in particular, road     each relevant planning scheme standard.
 access, parking facilities, sewerage services                                                                       The nature of the works (i.e. restoration of oyster
 and water services, having regard to the                                                                            ecosystems) is such that infrastructure, parking,
 following—                                                                                                          sewerage and water services are not required.
 (a) the nature and scale of the works;

 (b) the number of people that may be on or at
 the works at any given time;

 (c) the number of vehicles that may be on or
 moored at the works at any given time;

 (d) the protection of any foreshores near the
 works and the vegetation and marine plants
 on the foreshores.




                                                                                                                                                                           9
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.