Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
Design, construction and safety - all prescribed tidal work
12.1 Prescribed tidal works are designed and The design and construction of the prescribed tidal works is Alternative Solution for Performance Outcome 12.1.
constructed in a way to ensure they are consistent with the following standards—
structurally sound, having regard to the (a) subject to paragraph (c), each Australian Standard relevant The rock substrate has been designed by ICM to be
following— to the design or construction of structures, to the extent structurally sound, having regard to the following:
(a) relevant engineering standards; requirements stated in the Standard apply to the design or (a) Relevant Australian Standards and
construction of prescribed tidal works; internationally recognised best practice
(b) the location of the works; guidelines. The structure has been certified
(b) subject to paragraph (c), the projected sea level rise is by an RPEQ engineer.
(c) the purpose for which the works are to be factored into the design and construction of the prescribed tidal (b) Site-specific design details have been
used; works; provided for Phase 1. The detailed design of
(d) the impact of flooding, storm tide, Phase 2 is required to be undertaken by a
(c) if a relevant planning scheme standard is more stringent
overtopping by waves, projected sea level coastal engineer, including consideration of
than the standard mentioned in paragraph (a) or (b)—the
rise, tidal influences and hydrodynamic forces; site-specific parameters and selection of a
relevant planning scheme standard, to the extent it is more
stabile rock grading. Refer ICM drawing
stringent than the standard mentioned in paragraph (a) or (b).
(e) the design life of the works; NROR-2012-02 (particularly notes 1 & 2).
(c) The works are to provide a suitable substrate
(f) the dead load of the works and the for habitat enhancement and restore rock
intended live load for the works; oyster ecosystems throughout the Noosa
River.
(g) the impact of hydrostatic pressures on the (d) The design considers forces resulting from
works; tidal and flood flows as well as wave action
(h) the stability of individual components of and vessel wake. Due to the nature of the
the works, including, for example, boulders, works, crest levels have been selected to
concrete blocks or sandbags. optimise habitat suitability for the target
species. High tides, storm tides and flooding
would be expected to result in overtopping of
the structure. The need for future adaptation
in response to climate change will be
dependent on monitoring of ecosystem health
over time.
(e) The design life of the works is 50 years,
although maintenance, modification or
adaptation may be required during this time in
response to monitoring of habitat
development.
(f) Stability of rock structures has been
determined in accordance with best practice
guidelines. It is not intended for the works to