Negotiated Decision Notice MCU22 0201
Details of the treatment of the wall are to be approved by Council prior to issue of
Building Approval.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call upon
the bond or guaranteed sum to effect compliance with conditions.
Dedication
10. Prior to the issue of any Development Permit for Operational Works or the sealing of any
survey plan associated with the development approval, whichever occurs sooner, a two
(2.0) metre wide strip extending across the full length of the frontage to Diamond Lane is
to be dedicated to Council as ‘Road’.
Nature and Extent of Approved Use
11. The hours of use of the components of the development are to be as follows:
Food and drink 6am to 8pm Monday to Sunday
outlet
Manual Car Wash Bays 5am to 10pm Monday to Sunday
Auto Wash Bays 5am to 10pm Monday to Sunday
Dog Wash Bays 7am to 6pm Monday to Sunday
Vacuum Bays 7am to 10 pm Monday to Sunday
12. The design, construction and operation of the development is to comply with the noise
limits in Table 3.3 of Ecoacoustics Report Number 21030923-01b dated 30 May 2024.
13. All plant and equipment is to be selected, installed and operated to not exceed the
source noise levels in Table 4.2 of Ecoacoustics Report Number 21030923-01b dated 30
May 2024.
14. The plant room is to be constructed of suitable acoustic grade materials to achieve
minimum Rw 45 for walls and door elements, with the roof to be metal sheeting or similar
with lining to underside of 50mm 32 kg/m3 sound absorbing insulation.
15. The two automatic carwash bays are to be fitted with automatic doors on the exit side
which remain closed during the wash/dry cycle and only open at completion of cycle for
car exit and automatically close at the commencement of the next wash cycle. The
automatic exit doors are to be constructed and certified to achieve a minimum acoustic
performance of Rw23.
16. The entry to the automatic car wash bays is to be fitted with a roof element constructed of
solid material as shown in Figures 1.2 and 1.3 of the Ecoacoustics Report Number
21030923-01b dated 30 May 2024 (unless updated as per comments above regarding
errors).
17. Following construction of the development and prior to commencement of operation
provide certification by an appropriately qualified acoustic consultant that the
development complies with the requirements of conditions 12, 13, 14, 15 and 16.
External Works
18. The Elm Street frontage of the site must be upgraded generally in accordance with
drawing number 20-032 DA revision F prepared by TMC Building Design Group dated
20 December 2023. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
Page 3 of 41
Document Set ID: 23372937
Version: 2, Version Date: 27/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.