Negotiated Decision Notice MCU22 0201

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                         Details of the treatment of the wall are to be approved by Council prior to issue of
                         Building Approval.
                         Performance Bond
                 9.      Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                         be submitted to Council, to secure performance of all conditions of this approval, prior to
                         the pre-start meeting. The cash bond or trading bank guarantee will be returned on
                         performance of the conditions of approval less any costs incurred by Council in
                         respect of enforcing performance of this permit. Council reserves the right to call upon
                         the bond or guaranteed sum to effect compliance with conditions.
                         Dedication
                 10.     Prior to the issue of any Development Permit for Operational Works or the sealing of any
                         survey plan associated with the development approval, whichever occurs sooner, a two
                         (2.0) metre wide strip extending across the full length of the frontage to Diamond Lane is
                         to be dedicated to Council as ‘Road’.
                         Nature and Extent of Approved Use
                 11.     The hours of use of the components of the development are to be as follows:

                           Food         and         drink 6am to 8pm Monday to Sunday
                           outlet

                           Manual Car Wash Bays            5am to 10pm Monday to Sunday

                           Auto Wash Bays                  5am to 10pm Monday to Sunday

                           Dog Wash Bays                   7am to 6pm Monday to Sunday

                           Vacuum Bays                     7am to 10 pm Monday to Sunday

                 12.     The design, construction and operation of the development is to comply with the noise
                         limits in Table 3.3 of Ecoacoustics Report Number 21030923-01b dated 30 May 2024.

                 13.     All plant and equipment is to be selected, installed and operated to not exceed the
                         source noise levels in Table 4.2 of Ecoacoustics Report Number 21030923-01b dated 30
                         May 2024.

                 14.     The plant room is to be constructed of suitable acoustic grade materials to achieve
                         minimum Rw 45 for walls and door elements, with the roof to be metal sheeting or similar
                         with lining to underside of 50mm 32 kg/m3 sound absorbing insulation.

                 15.     The two automatic carwash bays are to be fitted with automatic doors on the exit side
                         which remain closed during the wash/dry cycle and only open at completion of cycle for
                         car exit and automatically close at the commencement of the next wash cycle. The
                         automatic exit doors are to be constructed and certified to achieve a minimum acoustic
                         performance of Rw23.

                 16.     The entry to the automatic car wash bays is to be fitted with a roof element constructed of
                         solid material as shown in Figures 1.2 and 1.3 of the Ecoacoustics Report Number
                         21030923-01b dated 30 May 2024 (unless updated as per comments above regarding
                         errors).

                 17.     Following construction of the development and prior to commencement of operation
                         provide certification by an appropriately qualified acoustic consultant that the
                         development complies with the requirements of conditions 12, 13, 14, 15 and 16.
                         External Works

                 18.     The Elm Street frontage of the site must be upgraded generally in accordance with
                         drawing number 20-032 DA revision F prepared by TMC Building Design Group dated
                         20 December 2023. The works must be undertaken in accordance with an Operational
                         Works approval and must include in particular:

                                                                                                         Page 3 of 41
Document Set ID: 23372937
Version: 2, Version Date: 27/11/2024
Log in to download the original file

Negotiated Decision Notice MCU22 0201.pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.