Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Planning Report (004)

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 19230                                                                   November 2019




The plan of development identifies the following criteria:

 Parameter                                       Comment
 Building height – 10m                           Complies
 Water Quality Treatment                         Refer to   the approved                Stormwater
 Each allotment to treat stormwater runoff prior Management Report.
 to exiting each allotment to the following
 standards:
              •   Total Nitrogen of 0.3mg/L,
              •   Total Phosphorus of 0.03mg/L,
              •   pH - 6 - 8,
              •   Faecal   Coliforms   -       1000
                  organisms/100mL, and
              •   Suspended Solids - 15mg/L for
                  combined wet and dry periods:
                  90%ile < 100mg/L for wet
                  weather periods.

 Each allotment shall submit a Stormwater and           The approved stormwater design achieves
 Water Quality Management Plan that shall               current annual pollutant load reduction
 comply with and address inter alia, the                objectives set by the State Planning Policy
 following issues in relation to the construction,      2016.
 establishment and operation phases of the
 development:
              •   All   necessary     erosion   and
                  sediment controls required. The
                  Erosion and Sediment Control
                  Plans shall cover all development
                  on site (during the construction,
                  establishment and operational
                  phases), ecological restoration
                  and remediation works.
              •   All     necessary     stormwater
                  treatment and water quality
                  devices associated with the
                  development shall be located
                  within the approved boundaries
                  of the lots and each development
                  precinct.
              •   Details of proposed locations and
                  dimensions       of     stormwater
                  treatment systems possible to
                  achieve     the     water   quality
                  objectives listed above.
              •   Details of stormwater reuse
                  strategies and detention devices
                  to ensure the hydrologic regime is
                  not altered from the current state.
              •   Details of proposed management
Development Assessment Report                                                             Page 17 of 27
Material Change of Use
5 Taylor Court, Cooroy
Lot 5 on SP197517
Log in to download the original file

Planning Report (004).pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.