Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
PO13 AO13 N/A
Road infrastructure is constructed to Road infrastructure is constructed in No new roads or pathways are provided as
minimise adverse environmental impacts, accordance with Council’s Planning part of the proposed development.
including from run-off and erosion. Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and
earthworks
External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
External Works and Infrastructure
PO14 AO14 Complies
Development is provided with external Where not already existing, the following It is expected as part of the conditions of
works— infrastructure components are provided at this development application approval,
(a) along the full extent of the frontage the frontage of the site— Council is to condition within reason
of the site to an appropriate (a) full width sealed road; appropriate frontage works having regard
standard having regard to the (b) concrete kerb and channel where to the conditions of the existing
specified function of the road; and appropriate; infrastructure along Rene Street.
(b) provided beyond the site’s frontage (c) forming and grading to footpaths;
if required. (d) vehicular kerb and footpath
crossings;
(e) a constructed bikeway;
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public utility
mains, services or installations;
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.