Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                           Acceptable Outcomes                              Planning Comment
 PO13                                           AO13                                             N/A
 Road infrastructure is constructed to          Road infrastructure is constructed in            No new roads or pathways are provided as
 minimise adverse environmental impacts,        accordance with Council’s Planning               part of the proposed development.
 including from run-off and erosion.            Scheme Policy PSP6 Engineering Design
                                                Standards – Roads, drainage and
                                                earthworks


External Works and Infrastructure          Table 9.4.7.3 Criteria for assessable development (part)

 Performance Outcomes                           Acceptable Outcomes                              Planning Comment
 External Works and Infrastructure
 PO14                                           AO14                                             Complies
 Development is provided with external          Where not already existing, the following        It is expected as part of the conditions of
 works—                                         infrastructure components are provided at        this development application approval,
    (a) along the full extent of the frontage   the frontage of the site—                        Council is to condition within reason
        of the site to an appropriate               (a) full width sealed road;                  appropriate frontage works having regard
        standard having regard to the               (b) concrete kerb and channel where          to the conditions of the existing
        specified function of the road; and             appropriate;                             infrastructure along Rene Street.
    (b) provided beyond the site’s frontage         (c) forming and grading to footpaths;
        if required.                                (d) vehicular kerb and footpath
                                                        crossings;
                                                    (e) a constructed bikeway;
                                                    (f) a constructed footpath;
                                                    (g) a constructed carriageway;
                                                    (h) required alterations to public utility
                                                        mains, services or installations;




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.