Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                           Acceptable Outcomes                           Planning Comment
                                                   (i) construction of any required
                                                       alterations to public utility mains,
                                                       services or installations;
                                                   (j) stormwater drainage works; and
                                                   (k) installation of electrical conduits.
 PO15                                                                                         Complies
 Any alterations or repairs to infrastructure   No acceptable outcome provided                It is expected that this would be part of the
 as a result of the development are made at                                                   conditions of this development approval.
 no cost to Council.
 PO16                                                                                         N/A
 Road infrastructure is proven to be            No acceptable outcome provided                No new roads are provided as part of the
 suitable for its use prior to Council                                                        proposed development.
 accepting the dedicated asset.


Staged development            Table 9.4.7.3 Criteria for assessable development (part)

 Performance Outcomes                           Acceptable Outcomes                           Planning Comment
 Staged development
 PO17                                                                                         N/A
 Staged development is planned, designed        No acceptable outcome provided                This proposal is not a staged development.
 and constructed to ensure that—
    (a) each stage of the development can
        be constructed without interruption
        to services and utilities provided to
        the previous stages;
    (b) the infrastructure provided is
        capable of servicing the entire
        development; and



jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.