Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
(i) construction of any required
alterations to public utility mains,
services or installations;
(j) stormwater drainage works; and
(k) installation of electrical conduits.
PO15 Complies
Any alterations or repairs to infrastructure No acceptable outcome provided It is expected that this would be part of the
as a result of the development are made at conditions of this development approval.
no cost to Council.
PO16 N/A
Road infrastructure is proven to be No acceptable outcome provided No new roads are provided as part of the
suitable for its use prior to Council proposed development.
accepting the dedicated asset.
Staged development Table 9.4.7.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Staged development
PO17 N/A
Staged development is planned, designed No acceptable outcome provided This proposal is not a staged development.
and constructed to ensure that—
(a) each stage of the development can
be constructed without interruption
to services and utilities provided to
the previous stages;
(b) the infrastructure provided is
capable of servicing the entire
development; and
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.