Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
during rainfall events during and
post construction; and
(d) the need to protect environmental
values and water quality of
receiving waters both during and
post construction.
PO2 AO2.1 Complies
Stormwater drainage infrastructure is Stormwater drainage planning, design and The development is proposed to have
planned, designed and constructed to: construction is in accordance with PSP6 adequate drainage with stormwater
(a) incorporate allowance for increased Engineering Design Standards - Roads, discharge to Rene Street and to existing
flood risk and tidal inundation drainage and earthworks and the latest Council owned stormwater piping through
through pipework as a result of version of the Queensland Urban Drainage the easement on the site’s eastern
cilmate change and sea level rise; Design Manual. boundary.
(b) ensure the development is
adequately drained; and AO2.2
(c) ensure stormwater is managed and The stormwater drainage system connects
lawfully discharged without altering to a lawful point of discharge in
stormwater drainage characteristics accordance with PSP6 Engineering Design
external to the site. Standards - Roads, drainage and
earthworks.
AO2.3
Stormwater flows discharging from the
development are demonstrated to be
consistent with pre-development
characteristics.
AO2.4
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.