Performance Outcomes Acceptable Outcomes Planning Comment
Development provides for the
management of stormwater to incorporate
appropriate allowance for climate change
impacts (including rainfall intensity and sea
level rise), in accordance with PSP6
Engineering Design Standards – Roads,
Drainage and Earthworks.
PO3 AO3.1 N/A
Stormwater drainage infrastructure Stormwater drainage infrastructure meets No new roads are provided as part of the
conveys run-off in a manner that allows the desired standards of service for roads proposed development.
roads to deliver desired standards of functionality set out in PSP6 Engineering
service appropriate to the local conditions Design Standards - Roads, Drainage and
and local stormwater drainage Earthworks.
characteristics.
PO4 AO4.1 Complies
Stormwater infrastructure is compatible The location, design and construction of The development will provide at Building
with existing infrastructure, allows for easy stormwater drainage structures is in Works application stage, details for
access for the ongoing maintenance by accordance with PSP6 Engineering Design infrastructure to be compatible with the
Council, is cost effective across its design Standards - Roads, drainage and existing infrastructure and are to built in
life. earthworks. accordance to Council’s Planning Scheme
Policy 6.
AO4.2
Where infrastructure is located on private
land an easement is dedicated over the
infrastructure in accordance with PSP6
Engineering Design Standards - Roads,
drainage and earthworks.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.