Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                            Acceptable Outcomes                             Planning Comment
                                                 Development provides for the
                                                 management of stormwater to incorporate
                                                 appropriate allowance for climate change
                                                 impacts (including rainfall intensity and sea
                                                 level rise), in accordance with PSP6
                                                 Engineering Design Standards – Roads,
                                                 Drainage and Earthworks.
 PO3                                             AO3.1                                           N/A
 Stormwater drainage infrastructure              Stormwater drainage infrastructure meets        No new roads are provided as part of the
 conveys run-off in a manner that allows         the desired standards of service for roads      proposed development.
 roads to deliver desired standards of           functionality set out in PSP6 Engineering
 service appropriate to the local conditions     Design Standards - Roads, Drainage and
 and local stormwater drainage                   Earthworks.
 characteristics.
 PO4                                             AO4.1                                           Complies
 Stormwater infrastructure is compatible         The location, design and construction of        The development will provide at Building
 with existing infrastructure, allows for easy   stormwater drainage structures is in            Works application stage, details for
 access for the ongoing maintenance by           accordance with PSP6 Engineering Design         infrastructure to be compatible with the
 Council, is cost effective across its design    Standards - Roads, drainage and                 existing infrastructure and are to built in
 life.                                           earthworks.                                     accordance to Council’s Planning Scheme
                                                                                                 Policy 6.
                                                 AO4.2
                                                 Where infrastructure is located on private
                                                 land an easement is dedicated over the
                                                 infrastructure in accordance with PSP6
                                                 Engineering Design Standards - Roads,
                                                 drainage and earthworks.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.