Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                         Acceptable Outcomes                          Planning Comment
                                              Editor's Note— PSP6 Engineering Design
                                              Standards - Roads, drainage and earthworks
                                              provides guidance on prepare a groundwater
                                              recharge and discharge plan.


Construction and establishment of stormwater management systems             Table 9.4.8.3 Criteria for assessable development (part)

 Performance Outcomes                         Acceptable Outcomes                          Planning Comment
 Construction and establishment of
 stormwater management systems
 PO14                                         AO14.1                                       N/A
 Construction methods provide for             An erosion and sediment control plan         To be addressed as part of future Building
 appropriate controls to avoid entry and      prepared in accordance with the              Works application.
 transport of litter, sediment, and           International Erosion Control Association
 associated prescribed water contaminants     Best Practice Books demonstrates that the
 into receiving waters.                       capture and release of stormwater
                                              achieves the design objectives listed in
 Editor's note— Water contaminants are        Table A: Construction phase – stormwater
 prescribed in the Environmental Protection   management design objectives of the State
 Act 1994.                                    Planning Policy (Appendix 2).

                                              Editor’s note— PSP6 Engineering Design
                                              Standards - Roads, drainage and earthworks
                                              provides guidance on requirements for
                                              preparing an Erosion Management Plan.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.