Performance Outcomes Acceptable Outcomes Planning Comment
Editor's Note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Construction and establishment of
stormwater management systems
PO14 AO14.1 N/A
Construction methods provide for An erosion and sediment control plan To be addressed as part of future Building
appropriate controls to avoid entry and prepared in accordance with the Works application.
transport of litter, sediment, and International Erosion Control Association
associated prescribed water contaminants Best Practice Books demonstrates that the
into receiving waters. capture and release of stormwater
achieves the design objectives listed in
Editor's note— Water contaminants are Table A: Construction phase – stormwater
prescribed in the Environmental Protection management design objectives of the State
Act 1994. Planning Policy (Appendix 2).
Editor’s note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on requirements for
preparing an Erosion Management Plan.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.