Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                     Acceptable Outcomes                           Planning Comment
                                          AO14.2
                                          Construction works are designed and
                                          managed to restrict the extent of clearing
                                          and soil exposure to the minimum
                                          necessary for access, and safe construction
                                          at any one time.

                                          AO14.3
                                          For buildings:
                                             (a) upstream runoff is diverted around
                                                 the construction site;
                                             (b) sediment barriers are provided
                                                 downslope of disturbed areas to
                                                 prevent sediment washing into
                                                 gutters, drains and waterways ,
                                                 wetlands or drainage lines either on
                                                 or off the site; and
                                             (c) temporary or permanent
                                                 downpipes are connected to the
                                                 stormwater system before laying
                                                 the roof; or
                                             (d) localised erosion is avoided by
                                                 directing flow from downpipes over
                                                 non-erosive areas.



                                          AO14.4
                                          Chemical flocculants used as part of an
                                          erosion and sediment control plan do not


jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.