Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
AO14.2
Construction works are designed and
managed to restrict the extent of clearing
and soil exposure to the minimum
necessary for access, and safe construction
at any one time.
AO14.3
For buildings:
(a) upstream runoff is diverted around
the construction site;
(b) sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways ,
wetlands or drainage lines either on
or off the site; and
(c) temporary or permanent
downpipes are connected to the
stormwater system before laying
the roof; or
(d) localised erosion is avoided by
directing flow from downpipes over
non-erosive areas.
AO14.4
Chemical flocculants used as part of an
erosion and sediment control plan do not
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.