Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                     Acceptable Outcomes                               Planning Comment
                                          treatment system is proposed, confirmation
                                          as to the suitability of the designated site to
                                          accommodate the on-site sewerage facility.
                                          Additionally, where the combined total peak
                                          design capacity of effluent treatment is less
                                          than 21 equivalent persons, the design of the
                                          system achieves a low to medium risk
                                          classification in accordance with Seqwater’s
                                          Land Use Risk Tool for onsite sewerage
                                          facilities.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.