 Performance Outcomes                       Acceptable Outcomes                            Planning Comment
                                            Pontoons are structurally capable of sitting
                                            on the sand bed. Rollers and bracing
                                            should account for this situation.

                                            AO13.11
                                            Jetties and pontoons are free standing and
                                            do not rely on connecting to any revetment
                                            wall or other structure.


Design, Construction and Safety – Boat Ramps          Table 9.4.9.3 Criteria for assessable development (part)

 Performance Outcomes                        Acceptable Outcomes                        Planning Comment
 Design, Construction and Safety for Boat Ramps – prescribed tidal works outside Noosa Waters Estate
 PO14                                        AO14.1                                     N/A
 Boat ramps are designed and constructed     Where there is an existing revetment       This development does not include
 to—                                         wall—                                      prescribed tidal works.
    (a) allow access by a wheeled boat          (a) the level of a boat ramp surface at
        trailer;                                    the revetment wall is no more than
    (b) ensure that unacceptable risks to           150 millimetres above the top of
        personal and public safety are              the wall, not more than 500
        unlikely to be caused;                      millimetres below the top of the
    (c) avoid cluttering of the waterways;          wall and not more than 200
    (d) avoid excessive traffic volumes             millimetres above the existing
        within foreshore areas and                  beach;
        adjoining lands; and                    (b) the ramp extends into the
    (e) ensure that visual amenity of the           waterway no more than 9 metres
        foreshore is maintained.                    from a revetment wall;




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.