Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
(c) the ramp is constructed at a
uniform grade no steeper than 20%
(1 in 5); and
(d) the outer end of the ramp is no
more than 100 millimetres above
the level of the beach (Refer Figure
9.4.9.3E).
AO14.2
No part of the ramp is to extend closer
than 1 metre to the prolongation of the
boundaries.
AO14.3
The boat ramp surface profile is concave to
allow concentration of water to the centre
of the ramp.
PO15 N/A
No new boat ramps are constructed within No acceptable outcome provided. This development does not include
the Noosa River system. prescribed tidal works.
Character and amenity Table 9.4.9.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Character and amenity – operational works within Noosa Waters Estate waterways
PO16 AO16.1 N/A
Works are designed and sited to ensure— For lots with watercourse frontage greater This development does not include
than 15 metres in width, jetties are setback prescribed tidal works.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.