Original source · versioned page text
Attachment B - Code Compliance Assessment
Table 9.4.10.3 - Criteria for assessment
Waste Separation Table 9.4.10.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Assessable Development
Waste Separation
PO1 AO1.1 Complies
Development that generates several Construction, operational and demolition See Attachment D – Waste Management
classes of waste is designed so waste is works are planned and managed in Plan.
collected, stored and disposed of in a safe accordance with Planning Scheme Policy
and ecologically sustainable manner. PSP9 Waste management.
Editor’s Note— PSP9 Waste Management
requires Waste Management Plans to be
prepared as part of certain types of
development applications to ensure proper
consideration is given to waste minimisation,
segregation and reuse.
AO1.2
Adequate area is provided on-site for the
collection and separate storage of
recyclable, non-recyclable, vegetative and
hazardous materials in their specific waste
streams during construction or demolition
works and the operational phase of
development.
PO2 AO2 Complies
All warehouse units have their own waste
storage areas allowing for sufficient
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.