Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
Table 9.4.10.3 - Criteria for assessment
Waste Separation       Table 9.4.10.3 Criteria for assessable development (part)

 Performance Outcomes                          Acceptable Outcomes                             Planning Comment
 Assessable Development
 Waste Separation
 PO1                                           AO1.1                                           Complies
 Development that generates several            Construction, operational and demolition        See Attachment D – Waste Management
 classes of waste is designed so waste is      works are planned and managed in                Plan.
 collected, stored and disposed of in a safe   accordance with Planning Scheme Policy
 and ecologically sustainable manner.          PSP9 Waste management.

                                               Editor’s Note— PSP9 Waste Management
                                               requires Waste Management Plans to be
                                               prepared as part of certain types of
                                               development applications to ensure proper
                                               consideration is given to waste minimisation,
                                               segregation and reuse.

                                               AO1.2
                                               Adequate area is provided on-site for the
                                               collection and separate storage of
                                               recyclable, non-recyclable, vegetative and
                                               hazardous materials in their specific waste
                                               streams during construction or demolition
                                               works and the operational phase of
                                               development.
 PO2                                           AO2                                             Complies
                                                                                               All warehouse units have their own waste
                                                                                               storage areas allowing for sufficient


jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.